Passenger Perspectives in Railway Timetabling: A Literature Review

ABSTRACT When looking at railway planning, a discrepancy exists between planners who focus on the train operations and publish fixed railway schedules, and passengers who look not only at the schedules but also at the entirety of their trip, from access to waiting to on-board travel and egress. Looking into this discrepancy is essential, as assessing railway performances by merely measuring train punctuality would provide an unfair picture of the level of service experienced by passengers. Firstly, passengers’ delays are often significantly larger than the train delays responsible for the passengers to be late. Secondly, trains’ punctuality is often strictly related to too tight schedules that in turn might translate into knock-on delays for longer dwelling times at stations, trip delays for increased risk of missing transfer connections, and uncertain assessment of the level of service experienced, especially with fluctuating passenger demand. A key aspect is the robustness of railway timetables. Empirical evidence indicates that passengers give more importance to travel time certainty than travel time reductions, as passengers associate an inherent disutility with travel time uncertainty. This disutility may be broadly interpreted as an anxiety cost for the need for having contingency plans in case of disruptions, and may be looked at as the motivator for the need for delay-robust railway timetables. Interestingly, passenger-oriented optimisation studies considering robustness in railway planning typically limit their emphasis on passengers to the consideration of transfer maintenance. Clearly, passengers’ travel behaviour is far more complex and multi-faceted and thus several other aspects should be considered, as becoming more and more evident from passenger surveys. The current literature review starts by looking at the parameters that railway optimisation/planning studies are focused on and the key performance indicators that impact railway planning. The attention then turns to the parameters influencing passengers’ perceptions and travel experiences. Finally, the review proposes guidelines on how to reduce the gap between the operators’ railway planning and performance measurement on the one hand and the passengers’ perception of the railway performance on the other hand. Thereby, the conclusions create a foundation for a more passenger-oriented railway timetabling ensuring that passengers are provided with the best service possible with the resources available.

[1]  Leo G. Kroon,et al.  Cyclic Railway Timetabling: A Stochastic Optimization Approach , 2004, ATMOS.

[2]  Anita Schöbel,et al.  An Empirical Analysis of Robustness Concepts for Timetabling , 2010, ATMOS.

[3]  Umberto Crisalli,et al.  A schedule-based assignment model with explicit capacity constraints for congested transit networks , 2012 .

[4]  Tom Reinhold,et al.  More passengers and reduced costs - the optimization of the Berlin Public Transport Network , 2008 .

[5]  Leo G. Kroon,et al.  Robust Train Routing and Online Re-scheduling , 2010, ATMOS.

[6]  I. A. Hansen,et al.  Optimizing capacity utilization of stations by estimating knock-on train delays , 2007 .

[7]  Mark Wardman,et al.  EUROPEAN WIDE META-ANALYSIS OF VALUES OF TRAVEL TIME FINAL REPORT TO THE EUROPEAN INVESTMENT BANK May 2012 , 2013 .

[8]  N. van Oort Service reliability improvement by enhanced network and timetable planning , 2012 .

[9]  René Weiskircher,et al.  Robustness and Resilience , 2004, Network Analysis.

[10]  Kay W. Axhausen,et al.  Demand-driven timetable design for metro services , 2014 .

[11]  J. Bates,et al.  The valuation of reliability for personal travel , 2001 .

[12]  Otto Anker Nielsen,et al.  A Stochastic Traffic Assignment Model Considering Differences in Passengers Utility Functions , 2000 .

[13]  Maria Börjesson,et al.  Valuations of travel time variability in scheduling versus mean-variance models , 2012 .

[14]  Otto Anker Nielsen,et al.  Passenger delay models for rail networks , 2009 .

[15]  Dario Pacciarelli,et al.  Bi-objective conflict detection and resolution in railway traffic management , 2012 .

[16]  Masoud Yaghini,et al.  Railway Passenger Train Delay Prediction via Neural Network Model , 2013 .

[17]  Anita Schöbel,et al.  A Bicriteria Approach for Robust Timetabling , 2009, Robust and Online Large-Scale Optimization.

[18]  Johanna Törnquist Krasemann,et al.  Quantifying railway timetable robustness in critical points , 2013, J. Rail Transp. Plan. Manag..

[19]  Sebastian Stiller,et al.  Computing delay resistant railway timetables , 2010, Comput. Oper. Res..

[20]  Dennis Huisman,et al.  Delay Management with Rerouting of Passengers , 2012, Transp. Sci..

[21]  Marc Nunkesser,et al.  Mining Railway Delay Dependencies in Large-Scale Real-World Delay Data , 2009, Robust and Online Large-Scale Optimization.

[22]  Jurjen S. Hooghiemstra,et al.  The use of simulation in the planning of the Dutch railway services , 1998, 1998 Winter Simulation Conference. Proceedings (Cat. No.98CH36274).

[23]  Norbert Pavlovic,et al.  A fuzzy Petri net model to estimate train delays , 2013, Simul. Model. Pract. Theory.

[24]  Gilbert Laporte,et al.  Evaluating passenger robustness in a rail transit network , 2012 .

[25]  Janic Milan The trans European railway network: Three levels of services for the passengers , 1996 .

[26]  Ryuji Tsuchiya,et al.  Route-Choice Support System for Passengers in the Face of Unexpected Disturbance of Train Operations , 2006 .

[27]  Nelson Carrasco Quantifying Reliability of Transit Service in Zurich, Switzerland , 2012 .

[28]  Miguel A. Salido,et al.  Robustness for a single railway line: Analytical and simulation methods , 2012, Expert Syst. Appl..

[29]  Twan Dollevoet,et al.  Delay Management and Dispatching in Railways , 2008 .

[30]  Rob M.P. Goverde,et al.  A delay propagation algorithm for large-scale railway traffic networks , 2010 .

[31]  Evelien van der Hurk,et al.  Passengers, Information, and Disruptions , 2015 .

[32]  Norio Tomii,et al.  An optimal delay management algorithm from passengers' viewpoints considering the whole railway network , 2011, J. Rail Transp. Plan. Manag..

[33]  Dirk Cattrysse,et al.  Robust railway station planning: An interaction between routing, timetabling and platforming , 2013, J. Rail Transp. Plan. Manag..

[34]  Leo G. Kroon,et al.  Reliability and Heterogeneity of Railway Services , 2006, Eur. J. Oper. Res..

[35]  Yanshuo Sun,et al.  Rail Transit Travel Time Reliability and Estimation of Passenger Route Choice Behavior , 2012 .

[36]  Niels van Oort,et al.  Reliability Improvement in Short Headway Transit Services , 2010 .

[37]  Dirk Van Oudheusden,et al.  Developing railway timetables which guarantee a better service , 2004, Eur. J. Oper. Res..

[38]  Maria Börjesson,et al.  On the use of “average delay” as a measure of train reliability , 2011 .

[39]  Sara Gestrelius,et al.  On the Delivery Robustness of Train Timetables with Respect to Production Replanning Possibilities , 2012 .

[40]  Chikara Hirai,et al.  Evaluation Method of Robustness for Train Schedules , 2007 .

[41]  Sara Gestrelius,et al.  Using timetabling optimization prototype tools in new ways to support decision making , 2012 .

[42]  Ingo A. Hansen,et al.  Performance indicators for railway timetables , 2013, 2013 IEEE International Conference on Intelligent Rail Transportation Proceedings.

[43]  El-Houssaine Aghezzaf,et al.  Defining robustness of a railway timetable , 2011 .

[44]  Dirk Cattrysse,et al.  Automated, Passenger Time Optimal, Robust Timetabling, Using Integer Programming , 2012 .

[45]  Matteo Fischetti,et al.  Fast Approaches to Improve the Robustness of a Railway Timetable , 2009, Transp. Sci..

[46]  Rommert Dekker,et al.  Stochastic Improvement of Cyclic Railway Timetables , 2006 .

[47]  R. Noland,et al.  Travel time variability: A review of theoretical and empirical issues , 2002 .

[48]  Johanna Törnquist Krasemann,et al.  Robustness in Swedish Railway Traffic Timetables , 2011 .

[49]  Michiel Vromans,et al.  Reliability of Railway Systems , 2005 .

[50]  Malachy Carey,et al.  Ex ante heuristic measures of schedule reliability , 1999 .

[51]  Mark D. Hickman,et al.  The Real–Time Stop–Skipping Problem , 2005, J. Intell. Transp. Syst..

[52]  Erhan Kozan,et al.  Modelling the number and location of sidings on a single line railway , 1997, Comput. Oper. Res..

[53]  Akshay Vij,et al.  Incorporating the influence of latent modal preferences on travel mode choice behavior , 2013 .

[54]  Robert Bush Does Every Trip Need to Be On Time? Multimodal Scheduling Performance Parameters with an Application to Amtrak Service in North Carolina , 2007 .

[55]  Nicolas Coulombel,et al.  The value of service reliability , 2013 .

[56]  Otto Anker Nielsen,et al.  User perspectives in public transport timetable optimisation , 2014 .

[57]  Jens Clausen,et al.  Robustness and Recovery in Train Scheduling - a Case Study from DSB S-tog a/s , 2006, ATMOS.

[58]  Matthias Müller-Hannemann,et al.  The Price of Robustness in Timetable Information , 2011, ATMOS.

[59]  Robert B. Noland,et al.  Travel-time uncertainty, departure time choice, and the cost of morning commutes , 1995 .

[60]  Matteo Fischetti,et al.  Robustness in Train Timetabling. , 2009 .

[61]  Norio Tomii,et al.  Identification of causes of delays in urban railways , 2012 .

[62]  Peng Gao,et al.  A simulation model for estimating train and passenger delays in large-scale rail transit networks , 2012 .

[63]  Paul Weston,et al.  Minimising train delays in a mixed traffic railway network with consideration of passenger delay , 2006 .

[64]  Pieter Vansteenwegen,et al.  Decreasing the passenger waiting time for an intercity rail network , 2007 .

[65]  Will Recker,et al.  Travel Time Reliability with Risk-Sensitive Travelers , 2001 .

[66]  Umberto Crisalli,et al.  A Doubly Dynamic Schedule-based Assignment Model for Transit Networks , 2001, Transp. Sci..

[67]  Agachai Sumalee,et al.  Dynamic stochastic transit assignment with explicit seat allocation model , 2009 .

[68]  Shinya Kikuchi,et al.  Transit Vehicle Stopping Regimes and Spacings , 1982 .

[69]  Alex Landex,et al.  Methods to estimate railway capacity and passenger delays , 2008 .

[70]  Feng Shi,et al.  Incorporating transfer reliability into equilibrium analysis of railway passenger flow , 2012, Eur. J. Oper. Res..

[71]  Birre Nyström,et al.  Improving railway punctuality by maintenance: a case study , 2005 .

[72]  Richard J. Boucherie,et al.  Running times on railway sections with heterogeneous train traffic , 1998 .

[73]  Matthias Finger,et al.  Integrated Timetables for Railway Passenger Transport Services , 2014 .

[74]  Dirk Cattrysse,et al.  Deriving all Passenger Flows in a Railway Network from Ticket Sales Data , 2011 .

[75]  Andrzej Jaszkiewicz,et al.  Advanced OR and AI methods in transportation , 2009, Eur. J. Oper. Res..

[76]  Mark Wardman,et al.  The impact of lateness and reliability on passenger rail demand , 2011 .

[77]  Yung-Hsiang Cheng,et al.  Train delay and perceived-wait time: passengers' perspective , 2014 .

[78]  Dirk Cattrysse,et al.  The train platforming problem: The infrastructure management company perspective , 2014 .

[79]  W. Greene,et al.  Embedding risk attitude and decision weights in non-linear logit to accommodate time variability in the value of expected travel time savings , 2011 .

[80]  P. Rietveld Six reasons why supply‐oriented indicators systematically overestimate service quality in public transport , 2005 .

[81]  L. Ingolotti,et al.  Robustness in railway transportation scheduling , 2008, 2008 7th World Congress on Intelligent Control and Automation.