Dealing with Stochasticity in Wood Remanufacturing Operations Planning

The planning process of wood remanufacturing operations encompasses challenging characteristic, including divergent co-production (one log tree may produce several different products), alternative processes (different receipts exist to produce the same products), short order cycle, dynamic market behaviour (with highly varying demand) and imperfect raw materials (due to its biological nature, the yield vary considerably). To deal with this complexity, in this paper random demand is modeled as scenario tree and three new predictive multi-stage stochastic programming models are developed with multiple objective functions. After implementing them employing datasets from a wood remanufacturing partner in Canada, the proposed models are compared to a reactive re-planning approach. The obtained results indicate that the new models exhibit higher quality solutions in comparison with their corresponding deterministic two-stage models. We also determine the number of stages for which the multi-stage programs provide better planning than the re-planning approach. KeywordsMulti-stage stochastic programming, Production planning, Demand uncertainty, Co-production, Wood remanufacturing sector.

[1]  Thomas C. Maness,et al.  A relational database approach to a linear programming-based decision support system for production planning in secondary wood product manufacturing , 2005, Decis. Support Syst..

[2]  R. Wets,et al.  Stochastic programming , 1989 .

[3]  Mustapha Nourelfath,et al.  A periodic re-planning approach for demand-driven wood remanufacturing industry: a real-scale application , 2014 .

[4]  Mikael Rönnqvist,et al.  Operations Research challenges in forestry: 33 open problems , 2015, Annals of Operations Research.

[5]  Arianna Alfieri,et al.  Stochastic Programming Models for Manufacturing Applications , 2005 .

[6]  Jayashankar M. Swaminathan,et al.  Multi-product inventory planning with downward substitution, stochastic demand and setup costs , 2004 .

[7]  Mustapha Nourelfath,et al.  Dynamic safety stock in co-production demand-driven wood remanufacturing mills: A case study , 2015 .

[8]  John R. Birge,et al.  Introduction to Stochastic Programming , 1997 .

[9]  Jeffrey W. Herrmann,et al.  Rescheduling Manufacturing Systems: A Framework of Strategies, Policies, and Methods , 2003, J. Sched..

[10]  Jayashankar M. Swaminathan Tool capacity planning for semiconductor fabrication facilities under demand uncertainty , 2000, Eur. J. Oper. Res..

[11]  A. C. Miller,et al.  Discrete Approximations of Probability Distributions , 1983 .

[12]  Mustapha Nourelfath,et al.  Analysis of uncontrollable supply effects on a co-production demand-driven wood remanufacturing mill with alternative processes , 2016, INFOR Inf. Syst. Oper. Res..

[13]  Peter Kall,et al.  Stochastic Programming , 1995 .

[14]  Adrian Pirraglia,et al.  Status of lean manufacturing implementation on secondary wood industries including residential, cabinet, millwork, and panel markets. , 2009 .

[15]  Fengqi You,et al.  Integration of Scheduling and Dynamic Optimization of Batch Processes under Uncertainty: Two-Stage Stochastic Programming Approach and Enhanced Generalized Benders Decomposition Algorithm , 2013 .

[16]  P. Brandimarte Multi-item capacitated lot-sizing with demand uncertainty , 2006 .

[17]  Masoumeh Kazemi Zanjani,et al.  A multi-stage stochastic programming approach for production planning with uncertainty in the quality of raw materials and demand , 2010 .

[18]  Costas D. Maranas,et al.  Managing demand uncertainty in supply chain planning , 2003, Comput. Chem. Eng..

[19]  Daoud Aït-Kadi,et al.  Production planning with uncertainty in the quality of raw materials: a case in sawmills , 2011, J. Oper. Res. Soc..

[20]  Mikael Rönnqvist,et al.  Using Operational Research for Supply Chain Planning in the Forest Products Industry , 2008, INFOR Inf. Syst. Oper. Res..

[21]  S. David Wu,et al.  Coordinating Strategic Capacity Planning in the Semiconductor Industry , 2003, Oper. Res..

[22]  Kai Huang,et al.  The Value of Multistage Stochastic Programming in Capacity Planning Under Uncertainty , 2009, Oper. Res..

[23]  Laureano F. Escudero,et al.  BFC, A branch-and-fix coordination algorithmic framework for solving some types of stochastic pure and mixed 0-1 programs , 2003, Eur. J. Oper. Res..

[24]  Robert A. Kozak,et al.  Solid wood supply impediments for secondary wood producers in British Columbia , 2003 .

[25]  Mikael Rönnqvist,et al.  Tactical supply chain planning for a forest biomass power plant under supply uncertainty , 2014 .

[26]  Sebastian Engell,et al.  Aggregated Scheduling of a Multiproduct Batch Plant by Two-Stage Stochastic Integer Programming , 2002 .

[27]  Geraldo Robson Mateus,et al.  Stochastic capacity planning and dynamic network design , 2013 .

[28]  A. Ruszczynski Stochastic Programming Models , 2003 .

[29]  Julia L. Higle,et al.  Stochastic Programming: Optimization When Uncertainty Matters , 2005 .