Dealing with Stochasticity in Wood Remanufacturing Operations Planning
暂无分享,去创建一个
Mustapha Nourelfath | Rezvan Rafiei | Luis Antonio De Santa-Eulalia | M. Nourelfath | L. A. Santa-Eulalia | Rezvan Rafiei
[1] Thomas C. Maness,et al. A relational database approach to a linear programming-based decision support system for production planning in secondary wood product manufacturing , 2005, Decis. Support Syst..
[2] R. Wets,et al. Stochastic programming , 1989 .
[3] Mustapha Nourelfath,et al. A periodic re-planning approach for demand-driven wood remanufacturing industry: a real-scale application , 2014 .
[4] Mikael Rönnqvist,et al. Operations Research challenges in forestry: 33 open problems , 2015, Annals of Operations Research.
[5] Arianna Alfieri,et al. Stochastic Programming Models for Manufacturing Applications , 2005 .
[6] Jayashankar M. Swaminathan,et al. Multi-product inventory planning with downward substitution, stochastic demand and setup costs , 2004 .
[7] Mustapha Nourelfath,et al. Dynamic safety stock in co-production demand-driven wood remanufacturing mills: A case study , 2015 .
[8] John R. Birge,et al. Introduction to Stochastic Programming , 1997 .
[9] Jeffrey W. Herrmann,et al. Rescheduling Manufacturing Systems: A Framework of Strategies, Policies, and Methods , 2003, J. Sched..
[10] Jayashankar M. Swaminathan. Tool capacity planning for semiconductor fabrication facilities under demand uncertainty , 2000, Eur. J. Oper. Res..
[11] A. C. Miller,et al. Discrete Approximations of Probability Distributions , 1983 .
[12] Mustapha Nourelfath,et al. Analysis of uncontrollable supply effects on a co-production demand-driven wood remanufacturing mill with alternative processes , 2016, INFOR Inf. Syst. Oper. Res..
[13] Peter Kall,et al. Stochastic Programming , 1995 .
[14] Adrian Pirraglia,et al. Status of lean manufacturing implementation on secondary wood industries including residential, cabinet, millwork, and panel markets. , 2009 .
[15] Fengqi You,et al. Integration of Scheduling and Dynamic Optimization of Batch Processes under Uncertainty: Two-Stage Stochastic Programming Approach and Enhanced Generalized Benders Decomposition Algorithm , 2013 .
[16] P. Brandimarte. Multi-item capacitated lot-sizing with demand uncertainty , 2006 .
[17] Masoumeh Kazemi Zanjani,et al. A multi-stage stochastic programming approach for production planning with uncertainty in the quality of raw materials and demand , 2010 .
[18] Costas D. Maranas,et al. Managing demand uncertainty in supply chain planning , 2003, Comput. Chem. Eng..
[19] Daoud Aït-Kadi,et al. Production planning with uncertainty in the quality of raw materials: a case in sawmills , 2011, J. Oper. Res. Soc..
[20] Mikael Rönnqvist,et al. Using Operational Research for Supply Chain Planning in the Forest Products Industry , 2008, INFOR Inf. Syst. Oper. Res..
[21] S. David Wu,et al. Coordinating Strategic Capacity Planning in the Semiconductor Industry , 2003, Oper. Res..
[22] Kai Huang,et al. The Value of Multistage Stochastic Programming in Capacity Planning Under Uncertainty , 2009, Oper. Res..
[23] Laureano F. Escudero,et al. BFC, A branch-and-fix coordination algorithmic framework for solving some types of stochastic pure and mixed 0-1 programs , 2003, Eur. J. Oper. Res..
[24] Robert A. Kozak,et al. Solid wood supply impediments for secondary wood producers in British Columbia , 2003 .
[25] Mikael Rönnqvist,et al. Tactical supply chain planning for a forest biomass power plant under supply uncertainty , 2014 .
[26] Sebastian Engell,et al. Aggregated Scheduling of a Multiproduct Batch Plant by Two-Stage Stochastic Integer Programming , 2002 .
[27] Geraldo Robson Mateus,et al. Stochastic capacity planning and dynamic network design , 2013 .
[28] A. Ruszczynski. Stochastic Programming Models , 2003 .
[29] Julia L. Higle,et al. Stochastic Programming: Optimization When Uncertainty Matters , 2005 .