Open-pit block sequencing optimization: A mathematical model and solution technique
暂无分享,去创建一个
[1] Erhan Kozan,et al. New graph-based algorithms to efficiently solve large scale open pit mining optimisation problems , 2016, Expert Syst. Appl..
[2] Amina Lamghari,et al. A hybrid method based on linear programming and variable neighborhood descent for scheduling production in open-pit mines , 2015, J. Glob. Optim..
[3] Ambros M. Gleixner,et al. LP-based disaggregation approaches to solving the open pit mining production scheduling problem with block processing selectivity , 2009, Comput. Oper. Res..
[4] Erhan Kozan,et al. An interactive planning and scheduling framework for optimising pits-to-crushers operations , 2012 .
[5] Erkan Topal,et al. Net present value maximization model for optimum cut-off grade policy of open pit mining operations , 2011 .
[6] Alexandra M. Newman,et al. Tailored Lagrangian Relaxation for the open pit block sequencing problem , 2014, Ann. Oper. Res..
[7] Alexandra M. Newman,et al. MineLib: a library of open pit mining problems , 2013, Ann. Oper. Res..
[8] Eduardo Moreno,et al. A New Algorithm for the Open-Pit Mine Production Scheduling Problem , 2012, Oper. Res..
[9] Paul Shaw,et al. Using Constraint Programming and Local Search Methods to Solve Vehicle Routing Problems , 1998, CP.
[10] Erkan Topal,et al. Flexible open-pit mine design under uncertainty , 2011 .
[11] S. Dreyfus,et al. Thermodynamical Approach to the Traveling Salesman Problem : An Efficient Simulation Algorithm , 2004 .
[12] Mustafa Kumral. Optimizing ore-waste discrimination and block sequencing through simulated annealing , 2013, Appl. Soft Comput..
[13] Erhan Kozan,et al. Integrated approach to optimize open-pit mine block sequencing , 2014 .
[14] Alexandra M. Newman,et al. A sliding time window heuristic for open pit mine block sequencing , 2011, Optim. Lett..
[15] Salih Ramazan,et al. The new Fundamental Tree Algorithm for production scheduling of open pit mines , 2007, Eur. J. Oper. Res..
[16] Alexandra M. Newman,et al. Open-Pit Block-Sequencing Formulations: A Tutorial , 2014, Interfaces.
[17] Andreas T. Ernst,et al. Medium-Term Rail Scheduling for an Iron Ore Mining Company , 2014, Interfaces.
[18] Jason West,et al. Optimising Coal Stockpiles in a Supply Chain Using a Dynamic Cost Flow Model , 2011 .
[19] Erhan Kozan,et al. A hybrid shifting bottleneck procedure algorithm for the parallel-machine job-shop scheduling problem , 2012, J. Oper. Res. Soc..
[20] Javad Sattarvand,et al. Long term production planning of open pit mines by ant colony optimization , 2015, Eur. J. Oper. Res..
[21] Behrooz Karimi,et al. Long-term open pit mine production planning: a review of models and algorithms , 2008 .
[22] Lou Caccetta,et al. An Application of Branch and Cut to Open Pit Mine Scheduling , 2003, J. Glob. Optim..
[23] David Pisinger,et al. Large Neighborhood Search , 2018, Handbook of Metaheuristics.
[24] Erhan Kozan,et al. Operations research for mining : a classification and literature review , 2011 .
[25] Erhan Kozan,et al. A new open-pit multi-stage mine production timetabling model for drilling, blasting and excavating operations , 2016 .
[26] H Eivazy,et al. A mixed integer linear programming model for short-term open pit mine production scheduling , 2012 .
[27] Alexandra M. Newman,et al. A Review of Operations Research in Mine Planning , 2010, Interfaces.
[28] Amina Lamghari,et al. A diversified Tabu search approach for the open-pit mine production scheduling problem with metal uncertainty , 2012, Eur. J. Oper. Res..
[29] Michel Gamache,et al. Mixed integer programming model for short term planning in open-pit mines , 2013 .
[30] Erhan Kozan,et al. A demand-responsive decision support system for coal transportation , 2012, Decis. Support Syst..
[31] Paul V. Johnson,et al. The Determination of a Dynamic Cut-Off Grade for the Mining Industry , 2011 .
[32] C. D. Gelatt,et al. Optimization by Simulated Annealing , 1983, Science.
[33] Mustafa Kumral. Production planning of mines: Optimisation of block sequencing and destination , 2012 .