A buyer-vendor system with untimely delivery costs: Traditional coordination vs. VMI with consignment stock

Abstract This paper investigates the impact of coordinating a two-level supply chain that consists of a single-vendor and a single-buyer in the presence of untimely delivery costs. Specifically, early and late deliveries outside an agreed delivery window are penalized. We investigate the replenishment policies of the vendor and the buyer with and without coordination. We show that untimely deliveries increase the replenishment cycle of the buyer, whether it coordinates with the vendor or not. More importantly, under untimely deliveries, coordination has a noticeable impact in aligning decisions of both players, thus is shown to be much more valuable in decreasing total costs. The implementation of a coordinated solution becomes especially beneficial when penalty and holding costs of the vendor are high, the delivery window is narrow, and the holding cost of the buyer and fixed ordering costs are low. Next, we compare the traditional replenishment coordination mechanism with a vendor-managed-inventory(VMI) mechanism with consignment stock(CS) under untimely deliveries. We show that while the performance of a VMI-CS system is poor when delivery times are deterministic, it outperforms a traditional coordination mechanism when they are not.

[1]  Kuntal Bhattacharyya,et al.  An optimization framework for improving supplier delivery performance , 2015 .

[2]  Arqum Mateen,et al.  Vendor managed inventory for single-vendor multi-retailer supply chains , 2015, Decis. Support Syst..

[3]  W.-C. Chen,et al.  Forward and backward stocking policies for a two-level supply chain with consignment stock agreement and stock-dependent demand , 2017, Eur. J. Oper. Res..

[4]  Bhaba R. Sarker,et al.  An optimal vendor-buyer cooperative policy under generalized lead-time distribution with penalty cost for delivery lateness , 2017 .

[5]  Jonathan Burton,et al.  Coordinated vs. independent inventory replenishment policies for a vendor and multiple buyers , 1994 .

[6]  S. Goyal “A JOINT ECONOMIC‐LOT‐SIZE MODEL FOR PURCHASER AND VENDOR”: A COMMENT* , 1988 .

[7]  Samuel Kotz,et al.  Asymmetric Laplace Distributions , 2001 .

[8]  Marcello Braglia,et al.  Consignment stock theory with a fixed batch manufacturing process , 2013 .

[9]  Simone Zanoni,et al.  A Stochastic Single-vendor Single-buyer Model under a Consignment Agreement , 2007, APMS.

[10]  M. Braglia,et al.  Modelling an industrial strategy for inventory management in supply chains: The 'Consignment Stock' case , 2003 .

[11]  Peter Williams,et al.  Quantitative analysis of semiconductor supply chain contracts with order flexibility under demand uncertainty: A case study , 2015, Comput. Ind. Eng..

[12]  Lucio Zavanella,et al.  The consignment stock of inventories: industrial case and performance analysis , 2003 .

[13]  Stanislaw Bylka,et al.  The consignment stock of inventories in coordinated model with generalized policy , 2015, Comput. Ind. Eng..

[14]  Mohamad Y. Jaber,et al.  Vendor managed inventory with consignment stock agreement for a supply chain with defective items , 2016 .

[15]  Mohamad Y. Jaber,et al.  Managerial and economic impacts of reducing delivery variance in the supply chain , 2008 .

[16]  Rajat Bhagwat,et al.  Performance measurement of supply chain management: A balanced scorecard approach , 2007, Comput. Ind. Eng..

[17]  A. Gunasekaran,et al.  A framework for supply chain performance measurement , 2004 .

[18]  R. Hill The single-vendor single-buyer integrated production-inventory model with a generalised policy , 1997 .

[19]  Y. Narahari,et al.  Achieving sharp deliveries in supply chains through variance pool allocation , 2006, Eur. J. Oper. Res..

[20]  Christoph H. Glock,et al.  Shipment consolidation in a multiple-vendor-single-buyer integrated inventory model , 2014, Comput. Ind. Eng..

[21]  Kamran Moinzadeh,et al.  Lead Time Management through Expediting in a Continuous Review Inventory System , 2014 .

[22]  Amy Hing-Ling Lau,et al.  A comparison of different methods for estimating the average inventory level in a (Q,R) system with backorders , 2002 .

[23]  Matthew J. Sobel,et al.  Manufacturing lead-time rules: Customer retention versus tardiness costs , 2005, Eur. J. Oper. Res..

[24]  S. Viswanathan,et al.  Coordinating supply chain inventories through common replenishment epochs , 2001, Eur. J. Oper. Res..

[25]  S. T. Enns,et al.  Measuring the performance sensitivity of replenishment systems using tradeoff curves , 2014 .

[26]  Hojung Shin,et al.  Quantifying suppliers' product quality and delivery performance: A sourcing policy decision model , 2009, Comput. Oper. Res..

[27]  M. J. Rosenblatt,et al.  Coordinating a three-level supply chain with quantity discounts , 2001 .

[28]  Mahmut Parlar,et al.  Continuous-review inventory problem with random supply interruptions , 1997 .

[29]  G. Gallego,et al.  Coordinating pricing and inventory replenishment policies for one wholesaler and one or more geographically dispersed retailers , 2002 .

[30]  S. Goyal,et al.  Coordinating a three-level supply chain with multiple suppliers, a vendor and multiple buyers , 2008 .

[31]  B. Giri,et al.  Consignment stock policy with unequal shipments and process unreliability for a two-level supply chain , 2017, Int. J. Prod. Res..

[32]  Bhaba R. Sarker,et al.  Consignment stocking policy models for supply chain systems: A critical review and comparative perspectives , 2014 .

[33]  Valérie Botta-Genoulaz,et al.  A framework for sustainable performance assessment of supply chain management practices , 2014, Comput. Ind. Eng..

[34]  Prafulla Joglekar Note-Comments on A Quantity Discount Pricing Model to Increase Vendor Profits , 1988 .

[35]  M. Frosolini,et al.  Safety stock management in single vendor–single buyer problem under VMI with consignment stock agreement , 2014 .

[36]  Maxim A. Bushuev Supply chain delivery performance: Points of view of a supplier and a buyer , 2013 .

[37]  C. Glock The joint economic lot size problem: A review , 2012 .

[38]  A. Gunasekaran,et al.  Performance measures and metrics in logistics and supply chain management: a review of recent literature (1995–2004) for research and applications , 2007 .

[39]  Suresh Kumar Goyal,et al.  An integrated inventory model for a single supplier-single customer problem , 1977 .

[40]  Alfred L. Guiffrida,et al.  Optimal position of supply chain delivery window: Concepts and general conditions , 2012 .

[41]  Alfred L. Guiffrida,et al.  Reducing the cost of untimely supply chain delivery performance for asymmetric Laplace distributed delivery , 2015 .

[42]  Ravi Shankar,et al.  The value of VMI beyond information sharing under time-varying stochastic demand , 2015 .

[43]  Siraj K. Zahran,et al.  Payment schemes for a two-level consignment stock supply chain system , 2015, Comput. Ind. Eng..

[44]  J. Wayne Patterson,et al.  On measuring company performance within a supply chain , 2009 .

[45]  M. Darwish,et al.  The joint economic lot sizing problem: Review and extensions , 2008, Eur. J. Oper. Res..

[46]  Mohamad Y. Jaber,et al.  Vendor Managed Inventory (VMI) with Consignment Stock (CS) agreement for a two-level supply chain with an imperfect production process with/without restoration interruptions , 2014 .

[47]  A. Banerjee A JOINT ECONOMIC-LOT-SIZE MODEL FOR PURCHASER AND VENDOR , 1986 .

[48]  Maxim A. Bushuev,et al.  Improving delivery performance for asymmetric Laplace distributed delivery time in a two-stage supply chain , 2018, Int. J. Prod. Res..

[49]  Mohamad Y. Jaber,et al.  Coordinating a two-level supply chain with delay in payments and profit sharing , 2006, Comput. Ind. Eng..

[50]  M. Jaber,et al.  Supply chain models with greenhouse gases emissions, energy usage and different coordination decisions , 2015 .

[51]  Siraj K. Zahran,et al.  The consignment stock case for a vendor and a buyer with delay-in-payments , 2016, Comput. Ind. Eng..

[52]  Moutaz Khouja,et al.  The impact of quality considerations on material flow in two-stage inventory systems , 2003 .

[53]  Rakesh Nagi,et al.  Cost characterizations of supply chain delivery performance , 2006 .

[54]  Jonathan Burton,et al.  Supply chain coordination through effective multi-stage inventory linkages in a JIT environment , 2007 .

[55]  Maxim A. Bushuev Delivery performance improvement in two-stage supply chain , 2018 .

[56]  Hui-Ming Wee,et al.  Collaborative vendor-buyer inventory system with declining market , 2008, Comput. Ind. Eng..

[57]  Mohammad Sadegh Moshtagh,et al.  A consignment stock scheme for closed loop supply chain with imperfect manufacturing processes, lost sales, and quality dependent return: Multi Levels Structure , 2019, International Journal of Production Economics.

[58]  Tanmoy Dasgupta,et al.  A technique for determining the optimum mix of logistics service providers of a make-to-order supply chain by formulating and solving a constrained nonlinear cost optimization problem , 2013 .