Heuristics for scheduling data gathering with limited base station memory
暂无分享,去创建一个
[1] Joanna Berlinska. Communication scheduling in data gathering networks with limited memory , 2014, Appl. Math. Comput..
[2] Joanna Berlinska. Scheduling Data Gathering with Maximum Lateness Objective , 2017, PPAM.
[3] Yao Xu,et al. Algorithms for Communication Scheduling in Data Gathering Network with Data Compression , 2017, Algorithmica.
[4] S. M. Johnson,et al. Optimal two- and three-stage production schedules with setup times included , 1954 .
[5] J. Berlińska. Scheduling for data gathering networks with data compression , 2015, Eur. J. Oper. Res..
[6] Christos H. Papadimitriou,et al. Flowshop scheduling with limited temporary storage , 1980, JACM.
[7] David S. Johnson,et al. Computers and Intractability: A Guide to the Theory of NP-Completeness , 1978 .
[8] Bertrand M. T. Lin,et al. Resource-constrained flowshop scheduling with separate resource recycling operations , 2012, Comput. Oper. Res..
[9] Feng-Cheng Lin,et al. Quantity-based buffer-constrained two-machine flowshop problem: active and passive prefetch models for multimedia applications , 2012, J. Sched..
[10] Guohui Lin,et al. Communication scheduling in data gathering networks of heterogeneous sensors with data compression: Algorithms and empirical experiments , 2018, Eur. J. Oper. Res..
[11] Thomas G. Robertazzi,et al. Divisible Load Scheduling inWireless Sensor Networks with Information Utility , 2008, 2008 IEEE International Performance, Computing and Communications Conference.
[12] Bertrand M. T. Lin,et al. A two-machine flowshop problem with processing time-dependent buffer constraints - An application in multimedia presentations , 2009, Comput. Oper. Res..
[13] P. A. Kononova,et al. The variable neighborhood search for the two machine flow shop problem with a passive prefetch , 2013 .
[14] Ian F. Akyildiz,et al. Wireless sensor networks: a survey , 2002, Comput. Networks.
[15] Yakov Zinder,et al. Permutation schedules for a two-machine flow shop with storage , 2016, Oper. Res. Lett..
[16] M. Moges,et al. Wireless sensor networks: scheduling for measurement and data reporting , 2006, IEEE Transactions on Aerospace and Electronic Systems.
[17] Bertrand M. T. Lin,et al. On the relocation problem with a second working crew for resource recycling , 2006, Int. J. Syst. Sci..
[18] R. Gomory,et al. Sequencing a One State-Variable Machine: A Solvable Case of the Traveling Salesman Problem , 1964 .