Node Importance Evaluation in Power System Restoration Considering the Impact of DC Converter Station
暂无分享,去创建一个
Hongtao Wang | Kang Zhao | Dong Yang | Huan Ma | Haizhou Hu
[1] Wang Xinbao. The Role of Yunnan-Guangdong ±800 kV DC Project in CSG Black-Start and Recovery Process , 2010 .
[2] G. Mavrotas,et al. Determining objective weights in multiple criteria problems: The critic method , 1995, Comput. Oper. Res..
[3] Wen Fu-shuan. A New Optimization Method for Determining Restoration Paths Based on Weighted Complex Network Model , 2009 .
[4] Gu Xue-ping. Node Importance Assessment Based Skeleton-network Reconfiguration , 2007 .
[5] Roberto Zaottini,et al. Use of HVDC links for power system restoration , 2009 .
[6] Huifang Wang,et al. CRITIC-Based Node Importance Evaluation in Skeleton-Network Reconfiguration of Power Grids , 2018, IEEE Transactions on Circuits and Systems II: Express Briefs.
[7] V.G. Agelidis,et al. VSC-Based HVDC Power Transmission Systems: An Overview , 2009, IEEE Transactions on Power Electronics.
[8] Ye Lin,et al. A Two-stage Strategy for Network Reconfiguration Based on Concept of Regret , 2013 .
[9] Tang Jian. A New Method for Black-start Path Optimization Based on Path and Node Weight Factors , 2012 .
[10] Bowen Zhou,et al. On the Power System Large-Scale Blackout in Brazil , 2018 .
[11] Su Yinsheng,et al. Analysis on Start-up Conditions of HVDC System in Black-start , 2011 .