WORK ZONE ROAD USER COSTS
暂无分享,去创建一个
[1] John Riedl,et al. Framework Model for Determining Incentive and Disincentive Amounts , 2007 .
[2] P. S. Hu,et al. Summary of Travel Trends , 2004 .
[3] J Walls,et al. Life-Cycle Cost Analysis in Pavement Design — Interim Technical Bulletin , 1998 .
[4] Samuel Labi,et al. Transportation Decision Making: Principles of Project Evaluation and Programming , 2007 .
[5] Wayne A Sarasua,et al. Evaluation of Interstate Highway Capacity for Short-Term Work Zone Lane Closures , 2004 .
[6] Ivan Damnjanovic,et al. Synthesis on Construction Unit Cost Development , 2009 .
[7] Adolfo Crespo Márquez,et al. Life Cycle Cost Analysis , 2012 .
[8] Nesamani S Kalandiyur. Estimating vehicle emissions in transportation planning incorporating the effect of network characteristics on driving patterns , 2007 .
[9] Ahmed Al-Kaisy,et al. Guidelines for Estimating Freeway Capacity at Long-Term Reconstruction Zones , 2002 .
[10] R A Krammes,et al. Updated short-term freeway work zone lane closure capacity values , 1992 .
[11] David J. Lovell,et al. A New Methodology to Estimate Capacity for Freeway Work Zones , 2001 .
[12] Michael Roy Adams. Development of a User Cost Estimation Procedure for Work Zones. , 2005 .
[13] R. Srinivasan,et al. Traffic Safety Evaluation of Nighttime and Daytime Work Zones , 2008 .
[14] Dan Murray,et al. Analysis of Operational Costs of Trucking , 2008 .
[15] Joseph E. Hummer,et al. Capacity for North Carolina Freeway Work Zones , 1996 .
[16] Paul J. Claffey. RUNNING COSTS OF MOTOR VEHICLES AS AFFECTED BY ROAD DESIGN AND TRAFFIC , 1971 .
[17] Peter Bein,et al. CRITIQUE OF TEXAS RESEARCH AND DEVELOPMENT FOUNDATION VEHICLE OPERATING COST MODEL , 1993 .
[18] Ossama Salem,et al. Improved Models for User Costs Analysis , 2008 .
[19] Sunil K. Sinha,et al. IMPROVING THE TIME PERFORMANCE OF HIGHWAY CONSTRUCTION CONTRACTS , 2006 .
[20] Praveen K Edara. Estimation of traffic impacts at work zones : state of the practice. , 2006 .
[21] Chen Fei See. Crash analysis of work zone lane closures with left-hand merge and downstream lane shift , 2008 .
[22] Ralph W. Plummer,et al. Incentive/disincentive guidelines for highway construction contracts , 1995 .
[23] Paul G. Carr,et al. Design Fees, the State of the Profession, and a Time for Corrective Action , 2005 .
[24] Sidney Scott,et al. CRITERIA AND GUIDELINES FOR INNOVATIVE CONTRACTING: FINAL REPORT. , 1996 .
[25] Kumares C. Sinha,et al. AN EVALUATION OF LANE CLOSURE STRATEGIES FOR INTERSTATE WORK ZONES. FINAL REPORT , 1995 .
[26] Gerald L Ullman,et al. Monitoring work zone safety and mobility impacts in Texas. , 2009 .
[27] Eul-Bum Lee,et al. Computer Simulation Model: Construction Analysis for Pavement Rehabilitation Strategies , 2005 .
[28] Douglas D. Gransberg,et al. Construction Manager-at-Risk Project Delivery for Highway Programs , 2010 .
[29] Yong Jiang. Traffic Capacity, Speed, and Queue-Discharge Rate of Indiana’s Four-Lane Freeway Work Zones , 1999 .
[30] D A Curry,et al. PROCEDURES FOR ESTIMATING HIGHWAY USER COSTS, AIR POLLUTION, AND NOISE EFFECTS , 1972 .
[31] Khaled Ksaibati,et al. Highway Construction Related Business Impacts: Phase I Report , 2004 .
[32] Jeffrey S. Russell,et al. Determining Minimum Contract Time for Highway Projects , 2000 .
[33] A Majeed. Vehicle operating costs , 1985 .
[34] James E Bryden,et al. Guidance for Implementation of the AASHTO Strategic Highway Safety Plan. Volume 17: A Guide for Reducing Work Zone Collisions , 2005 .
[35] C. Kepner,et al. The New Rational Manager , 1981 .
[36] M. Chowdhury,et al. Estimating Interstate Highway Capacity for Short-Term Work Zone Lane Closures: Development of Methodology , 2006 .
[37] Madhav Chitturi,et al. Methodology for Estimating Operating Speed and Capacity in Work Zones , 2004 .
[38] Ivan Damnjanovic,et al. Selection and Evaluation of Alternative Contracting Methods to Accelerate Project Completion , 2008 .
[39] Keith R. Molenaar,et al. MODEL FOR PUBLIC SECTOR DESIGN-BUILD PROJECT SELECTION , 1998 .
[40] S H Richards,et al. TRAFFIC CAPACITY THROUGH WORK ZONES ON URBAN FREEWAYS , 1981 .
[41] Bhagwant Persaud,et al. Crash Cost Estimates by Maximum Police-Reported Injury Severity Within Selected Crash Geometries , 2005 .
[42] Jesse L Buffington,et al. Estimated Construction Period Impact of Widening State Highway 21 in Caldwell, Texas , 1996 .
[43] Wei Tong Chen,et al. Time Is Money: Innovative Contracting Methods in Highway Construction , 1995 .