WORK ZONE ROAD USER COSTS

[1]  John Riedl,et al.  Framework Model for Determining Incentive and Disincentive Amounts , 2007 .

[2]  P. S. Hu,et al.  Summary of Travel Trends , 2004 .

[3]  J Walls,et al.  Life-Cycle Cost Analysis in Pavement Design — Interim Technical Bulletin , 1998 .

[4]  Samuel Labi,et al.  Transportation Decision Making: Principles of Project Evaluation and Programming , 2007 .

[5]  Wayne A Sarasua,et al.  Evaluation of Interstate Highway Capacity for Short-Term Work Zone Lane Closures , 2004 .

[6]  Ivan Damnjanovic,et al.  Synthesis on Construction Unit Cost Development , 2009 .

[7]  Adolfo Crespo Márquez,et al.  Life Cycle Cost Analysis , 2012 .

[8]  Nesamani S Kalandiyur Estimating vehicle emissions in transportation planning incorporating the effect of network characteristics on driving patterns , 2007 .

[9]  Ahmed Al-Kaisy,et al.  Guidelines for Estimating Freeway Capacity at Long-Term Reconstruction Zones , 2002 .

[10]  R A Krammes,et al.  Updated short-term freeway work zone lane closure capacity values , 1992 .

[11]  David J. Lovell,et al.  A New Methodology to Estimate Capacity for Freeway Work Zones , 2001 .

[12]  Michael Roy Adams Development of a User Cost Estimation Procedure for Work Zones. , 2005 .

[13]  R. Srinivasan,et al.  Traffic Safety Evaluation of Nighttime and Daytime Work Zones , 2008 .

[14]  Dan Murray,et al.  Analysis of Operational Costs of Trucking , 2008 .

[15]  Joseph E. Hummer,et al.  Capacity for North Carolina Freeway Work Zones , 1996 .

[16]  Paul J. Claffey RUNNING COSTS OF MOTOR VEHICLES AS AFFECTED BY ROAD DESIGN AND TRAFFIC , 1971 .

[17]  Peter Bein,et al.  CRITIQUE OF TEXAS RESEARCH AND DEVELOPMENT FOUNDATION VEHICLE OPERATING COST MODEL , 1993 .

[18]  Ossama Salem,et al.  Improved Models for User Costs Analysis , 2008 .

[19]  Sunil K. Sinha,et al.  IMPROVING THE TIME PERFORMANCE OF HIGHWAY CONSTRUCTION CONTRACTS , 2006 .

[20]  Praveen K Edara Estimation of traffic impacts at work zones : state of the practice. , 2006 .

[21]  Chen Fei See Crash analysis of work zone lane closures with left-hand merge and downstream lane shift , 2008 .

[22]  Ralph W. Plummer,et al.  Incentive/disincentive guidelines for highway construction contracts , 1995 .

[23]  Paul G. Carr,et al.  Design Fees, the State of the Profession, and a Time for Corrective Action , 2005 .

[24]  Sidney Scott,et al.  CRITERIA AND GUIDELINES FOR INNOVATIVE CONTRACTING: FINAL REPORT. , 1996 .

[25]  Kumares C. Sinha,et al.  AN EVALUATION OF LANE CLOSURE STRATEGIES FOR INTERSTATE WORK ZONES. FINAL REPORT , 1995 .

[26]  Gerald L Ullman,et al.  Monitoring work zone safety and mobility impacts in Texas. , 2009 .

[27]  Eul-Bum Lee,et al.  Computer Simulation Model: Construction Analysis for Pavement Rehabilitation Strategies , 2005 .

[28]  Douglas D. Gransberg,et al.  Construction Manager-at-Risk Project Delivery for Highway Programs , 2010 .

[29]  Yong Jiang Traffic Capacity, Speed, and Queue-Discharge Rate of Indiana’s Four-Lane Freeway Work Zones , 1999 .

[30]  D A Curry,et al.  PROCEDURES FOR ESTIMATING HIGHWAY USER COSTS, AIR POLLUTION, AND NOISE EFFECTS , 1972 .

[31]  Khaled Ksaibati,et al.  Highway Construction Related Business Impacts: Phase I Report , 2004 .

[32]  Jeffrey S. Russell,et al.  Determining Minimum Contract Time for Highway Projects , 2000 .

[33]  A Majeed Vehicle operating costs , 1985 .

[34]  James E Bryden,et al.  Guidance for Implementation of the AASHTO Strategic Highway Safety Plan. Volume 17: A Guide for Reducing Work Zone Collisions , 2005 .

[35]  C. Kepner,et al.  The New Rational Manager , 1981 .

[36]  M. Chowdhury,et al.  Estimating Interstate Highway Capacity for Short-Term Work Zone Lane Closures: Development of Methodology , 2006 .

[37]  Madhav Chitturi,et al.  Methodology for Estimating Operating Speed and Capacity in Work Zones , 2004 .

[38]  Ivan Damnjanovic,et al.  Selection and Evaluation of Alternative Contracting Methods to Accelerate Project Completion , 2008 .

[39]  Keith R. Molenaar,et al.  MODEL FOR PUBLIC SECTOR DESIGN-BUILD PROJECT SELECTION , 1998 .

[40]  S H Richards,et al.  TRAFFIC CAPACITY THROUGH WORK ZONES ON URBAN FREEWAYS , 1981 .

[41]  Bhagwant Persaud,et al.  Crash Cost Estimates by Maximum Police-Reported Injury Severity Within Selected Crash Geometries , 2005 .

[42]  Jesse L Buffington,et al.  Estimated Construction Period Impact of Widening State Highway 21 in Caldwell, Texas , 1996 .

[43]  Wei Tong Chen,et al.  Time Is Money: Innovative Contracting Methods in Highway Construction , 1995 .