Construction Project Scheduling Problem with Uncertain Resource Constraints
暂无分享,去创建一个
[1] Erik Demeulemeester,et al. A note on the paper "Resource-constrained project scheduling: Notation, classification, models and methods" by Brucker et al , 2001, Eur. J. Oper. Res..
[2] V. Maniezzo,et al. An Exact Algorithm for the Resource-Constrained Project Scheduling Problem Based on a New Mathematical Formulation , 1998 .
[3] Armin Scholl,et al. PROGRESS: Optimally solving the generalized resource-constrained project scheduling problem , 2000, Math. Methods Oper. Res..
[4] Sönke Hartmann,et al. Project Scheduling under Limited Resources , 1999 .
[5] Dimitri Golenko-Ginzburg,et al. Stochastic network project scheduling with non-consumable limited resources , 1997 .
[6] S. Selcuk Erenguc,et al. A tabu search procedure for the resource constrained project scheduling problem with discounted cash flows , 1994 .
[7] Douglas D. Gemmill,et al. Using tabu search to schedule activities of stochastic resource-constrained projects , 1998, Eur. J. Oper. Res..
[8] Golenko-Ginzburg Dimitri,et al. Resource supportability simulation model for a man-machine production system , 2000 .
[9] Bert De Reyck,et al. A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations , 1998, Eur. J. Oper. Res..
[10] Peter Brucker,et al. A linear programming and constraint propagation-based lower bound for the RCPSP , 2000, Eur. J. Oper. Res..
[11] Sou-Sen Leu,et al. A genetic-algorithm-based resource-constrained construction scheduling system , 1999 .
[12] Osama Moselhi,et al. Near optimal solution for resource-constrained scheduling problems , 1993 .
[13] Salah E. Elmaghraby,et al. Chance-constrained programming in activity networks: A critical evaluation , 2001, Eur. J. Oper. Res..
[14] Robert Klein,et al. Bidirectional planning: improving priority rule-based heuristics for scheduling resource-constrained projects , 2000, Eur. J. Oper. Res..
[15] S. Selcuk Erenguc,et al. The resource constrained project scheduling problem with multiple crashable modes: An exact solution method , 2001 .
[16] Baoding Liu,et al. Uncertain Programming , 1999 .
[17] Sabah U. Randhawa,et al. Resource-constrained project scheduling with renewable and non-renewable resources and time-resource tradeoffs , 1997 .
[18] Rema Padman,et al. Heuristic scheduling of resource‐constrained projects with cash flows , 1997 .
[19] Peter Brucker,et al. A branch and bound algorithm for the resource-constrained project scheduling problem , 1998, Eur. J. Oper. Res..
[20] Michio Sugeno,et al. Fuzzy systems theory and its applications , 1991 .
[21] S. Selçuk Erengüç,et al. The resource constrained project scheduling problem with multiple crashable modes: A heuristic procedure , 1998, Eur. J. Oper. Res..
[22] Pierpaolo Pontrandolfo,et al. Project duration in stochastic networks by the PERT-path technique , 2000 .
[23] Rolf H. Möhring,et al. Resource-constrained project scheduling: Notation, classification, models, and methods , 1999, Eur. J. Oper. Res..
[24] Dimitri Golenko-Ginzburg,et al. A heuristic for network project scheduling with random activity durations depending on the resource allocation , 1998 .
[25] S. Selcuk Erenguc,et al. Project Scheduling Problems: A Survey , 1993 .
[26] Sou-Sen Leu,et al. Fuzzy Optimal Model for Resource-Constrained Construction Scheduling , 1999 .
[27] David Greenwood,et al. An efficient method for scheduling construction projects with resource constraints , 2001 .
[28] S. Selçuk Erengüç,et al. A tabu search procedure for the resource constrained project scheduling problem with discounted cash flows , 1994, Comput. Oper. Res..
[29] Erik Demeulemeester,et al. Resource-constrained project scheduling: A survey of recent developments , 1998, Comput. Oper. Res..
[30] Jan Węglarz,et al. Project scheduling : recent models, algorithms, and applications , 1999 .
[31] Erik Demeulemeester,et al. An efficient optimal solution procedure for the preemptive resource-constrained project scheduling problem , 1996 .