An Approximation Approach for an Integrated Part Quality Inspection and Preventive Maintenance Planning in a Nonlinear Deteriorating Serial Multi-stage Manufacturing System

Abstract This paper develops a mixed-integer non-linear programming model for an integrated planning of part quality inspection and preventive maintenance activities. This model considers a serial multi-stage manufacturing system while its production stages are deteriorating nonlinearly. The deterioration is assumed a non-linear process and an approximation approach based on the separable programming is developed to cope with the non-linearity. The model determines the optimum times and locations for performing inspection and preventive maintenance activities while minimizing total manufacturing cost. The theoretical achievement of the presented approach is investigated through a numerical example.

[1]  Yau-Ren Shiau,et al.  Concurrent process/inspection planning for a customized manufacturing system based on genetic algorithm , 2007 .

[2]  Jeffrey S. Smith,et al.  An optimization model for selective inspection in serial manufacturing systems , 2004 .

[3]  Bong Jin Yum,et al.  Optimal inspection policies in a serial production system including scrap rework and repair: an MILP approach , 1987 .

[4]  Giri Kumar Tayi,et al.  An integrated production-inventory model with reprocessing and inspection , 1988 .

[5]  Stanley B. Gershwin,et al.  Analysis of long flow lines with quality and operational failures , 2008 .

[6]  Peter Kipruto Chemweno,et al.  Modelling maintenance effects on manufacturing equipment performance: results from simulation analysis , 2014 .

[7]  Giacomo Maria Galante,et al.  Integrated approach to part scheduling and inspection policies for a job shop manufacturing system , 2007 .

[8]  Konstantin Kogan,et al.  Optimal allocation of inspection effort over a finite planning horizon , 2002 .

[9]  Tullio Tolio,et al.  Design and management of manufacturing systems for production quality , 2014 .

[10]  R. Tavakkoli-Moghaddam,et al.  A novel model for the integrated planning of part quality inspection and preventive maintenance in a linear-deteriorating serial multi-stage manufacturing system , 2018 .

[11]  Tzvi Raz,et al.  Economic optimization of off-line inspection , 2000 .

[12]  Tal Raviv,et al.  Optimizing the quality control station configuration , 2007 .

[13]  G. Grammin Polynomial-time Algorithm , 1984 .

[14]  Celestine A. Ntuen,et al.  A study for optional inspection policies in a flexible manufacturing cell , 1988 .

[15]  Yu Ding,et al.  A survey of inspection strategy and sensor distribution studies in discrete-part manufacturing processes , 2006 .

[16]  Lloyd A. Swanson,et al.  Inspector location in convergent production lines , 1985 .

[17]  Giri Kumar Tayi,et al.  Inspection configuration and reprocessing decisions in serial production systems , 1991 .

[18]  Yadati Narahari,et al.  Modeling reentrant manufacturing systems with inspection stations , 1996 .

[19]  A. Sadegheih,et al.  Sequence optimization and design of allocation using GA and SA , 2007, Appl. Math. Comput..

[20]  Tal Raviv,et al.  A polynomial time algorithm for solving a quality control station configuration problem , 2008, Discret. Appl. Math..

[21]  Reza Tavakkoli-Moghaddam,et al.  A review on optimisation of part quality inspection planning in a multi-stage manufacturing system , 2019, Int. J. Prod. Res..