[1] Junichi Toyoda,et al. Optimal generating unit maintenance scheduling for multi-area system with network constraints , 1991 .
[2] J.F. Dopazo,et al. Optimal generator maintenance scheduling using integer programming , 1975, IEEE Transactions on Power Apparatus and Systems.
[3] J. Stremel,et al. Maintenance Scheduling Under Uncertainty , 1981, IEEE Transactions on Power Apparatus and Systems.
[4] John Stremel,et al. Maintenance Scheduling for Generation System Planning , 1981, IEEE Transactions on Power Apparatus and Systems.
[5] L. L. Garver,et al. Adjusting Maintenance Schedules to Levelize Risk , 1972 .
[6] D. Chattopadhyay,et al. A multi-area linear programming approach for analysis of economic operation of the Indian power system , 1996 .
[7] H. M. Merrill,et al. Power plant maintenance scheduling: optimizing economics and reliability , 1991 .
[8] Jyoti K. Parikh,et al. A systems approach to least-cost maintenance scheduling for an interconnected power system , 1995 .
[9] J. Toyoda,et al. Maintenance scheduling based on two level hierarchical structure to equalize incremental risk , 1989, Conference Papers Power Industry Computer Application Conference.
[10] Roy Billinton,et al. Generating Unit Maintenance Scheduling for Single and Two Interconnected Systems , 1984, IEEE Power Engineering Review.