Multi-attribute selection method for materials handling equipment

Rail-mounted boom type bucket wheel reclaimers and stacker-reclaimers are primary means of materials handling at stockyards. Therefore, the selection of the best possible equipment type (model) is of crucial importance for the decision-makers. The authors contribute to the body of knowledge by developing a novel methodology for the selection of this equipment type. Both the Coefficient of Technical Level (CTL) and Analytic Hierarchy Process (AHP) methods were used in the selection process. This methodology may be used by material handling system decision-makers to help in the selection of a specific type when acquiring a new equipment.

[1]  Dragan Komljenovic,et al.  Evaluation of the Technical Level Coefficient of Rail-Mounted Bucket Wheel Stacker-Reclaimers and Reclaimers , 2004 .

[2]  Osman Kulak,et al.  A decision support system for fuzzy multi-attribute selection of material handling equipments , 2005, Expert Syst. Appl..

[3]  C. Kahraman,et al.  Fuzzy multi-attribute equipment selection based on information axiom , 2005 .

[4]  Shamil Naoum,et al.  A hybrid knowledge base system and genetic algorithms for equipment selection , 2000 .

[5]  T. Saaty How to Make a Decision: The Analytic Hierarchy Process , 1990 .

[6]  Atac Bascetin,et al.  Technical note: An application of the analytic hierarchy process in equipment selection at Orhaneli open pit coal mine , 2004 .

[7]  Henry C. W. Lau,et al.  Integration of expert system with analytic hierarchy process for the design of material handling equipment selection system , 2001 .

[8]  Sabah Alkass,et al.  EXPERT SYSTEM FOR EARTHMOVING EQUIPMENT SELECTION IN ROAD CONSTRUCTION , 1988 .

[9]  Serji N. Amirkhanian,et al.  Expert System for Equipment Selection for Earth-Moving Operations , 1992 .

[10]  T. Saaty,et al.  The Analytic Hierarchy Process , 1985 .

[11]  Bijan Sarkar,et al.  Selection of opencast mining equipment by a multi-criteria decision-making process , 2002 .

[12]  R. S. Lashkari,et al.  A multi-objective model of operation allocation and material handling system selection in FMS design , 2007 .

[13]  Timothy J. Greene,et al.  A knowledge-based system for conveyor equipment selection , 2004, Expert Syst. Appl..

[14]  Shankar Chakraborty,et al.  Design of a material handling equipment selection model using analytic hierarchy process , 2006 .

[15]  Joseph H. M. Tah,et al.  Genetic algorithms application and testing for equipment selection , 1999 .

[16]  Ayhan Kesimal,et al.  APPLICATION OF FUZZY MULTIPLE ATTRIBUTE DECISION MAKING IN MINING OPERATIONS , 2002 .

[17]  Ali Touran,et al.  Integration of simulation with expert systems , 1990 .