Construction Management Process Rngineering - Organizational Human Resource Planning for Multiple Projects

Applying the business process reengineering and organization planning philosophy, this study focuses on human resource planning in construction management process reengineering (CMPR) to develop a team-based human resource planning (THRP) method for deploying laborpower. The THRP method has two purposes; the first is to determine the maximum loading of projects the original laborpower can carry, and the second is to identify the range of laborpower required for expected project loadings in the future. The THRP method includes four phases, namely, process reengineering, data preparing, human resource allocation, and simulation. Using the THRP method, a construction company cannot only design a team-based organizational structure, but also allocate human resources based on cross-functional processes. Moreover, human resource utilizations before and after CMPR can be compared to evaluate savings attributable to the CMPR. As a consequence, optimum laborpower can be assessed, and human resources allocated to fit the changing processes and circumstances of a construction company's growing business.

[1]  M. Hammer,et al.  REENGINEERING THE CORPORATION: A MANIFESTO FOR BUSINESS REVOLUTION , 1995 .

[2]  Daniel W. Halpin,et al.  CYCLONE — Method for Modeling Job Site Processes , 1977 .

[3]  Yan Jin,et al.  Computational Organization Analysis for Designing Concurrent Engineering Teams , 1995 .

[4]  Simaan M. AbouRizk,et al.  Resource-based modeling for construction simulation , 1997 .

[5]  Patricio Gomez-Chadwick,et al.  Graphical Coordination of Plant Usage and Personnel , 1978 .

[6]  Michael Hammer,et al.  Reengineering Work: Don’t Automate, Obliterate , 1990 .

[7]  Raymond E. Levitt,et al.  Approaches to Simulating Organizational Behavior of Concurrent Design Teams , 1996 .

[8]  Daniel W. Halpin,et al.  SIMPLIFIED SIMULATION SYSTEM FOR CONSTRUCTION PROJECTS , 1998 .

[9]  Simaan M. AbouRizk,et al.  PROBABILISTIC SIMULATION STUDIES FOR REPETITIVE CONSTRUCTION PROCESSES , 1990 .

[10]  Min-Yuan Cheng,et al.  REENGINEERING OF CONSTRUCTION MANAGEMENT PROCESS , 2003 .

[11]  William F. Maloney,et al.  Strategic Planning for Human Resource Management in Construction , 1997 .

[12]  D.W. Halpin,et al.  Simulation as a tool for resource management , 2000, 2000 Winter Simulation Conference Proceedings (Cat. No.00CH37165).

[13]  F. Caeldries Reengineering the Corporation: A Manifesto for Business Revolution , 1994 .

[14]  Leonhard E. Bernold Simulation of Nonsteady Construction Processes , 1989 .

[15]  Daniel W. Halpin,et al.  Simulation as a Tool for Pile Productivity Assessment , 2004 .

[16]  Min-Yuan Cheng,et al.  Optimal Project Organizational Structure for Construction Management , 2003 .

[17]  Samuel T. Ariaratnam,et al.  RISK-BASED LIFE-CYCLE COSTING OF INFRASTRUCTURE REHABILITATION AND CONSTRUCTION ALTERNATIVES , 2003 .

[18]  Jerome P. Miller Engineering Scheduling with Manpower Allocation , 1975 .