Technical operations and maintenance activities at the Paranal Observatory

After 20 years of operations, the Paranal Observatory has accumulated some experience with maintenance of systems, and has lately adopted the methodology called ‘Maintien en Condition Operationnelle’ (MCO). We will describe and review the practical implementation of this strategy, the tools used, the benefits and challenges as well as practical examples and how it is overall managed. The approach is also a benchmarking exercise for operation of the ESO-ELT in the future.

[1]  Erich Fernando Bugueno Preventive maintenance optimization at Paranal Observatory , 2010, Astronomical Telescopes + Instrumentation.

[2]  Gianpietro Marchiori,et al.  Reliability-centered maintenance for ground-based large optical telescopes and radio antenna arrays , 2014, Astronomical Telescopes and Instrumentation.

[3]  Nelson Montano,et al.  Experiences with VLT engineering maintenance and support , 2000, Astronomical Telescopes + Instrumentation.

[4]  J. Droff Maintien En Condition Operationnelle (Mco) Des Materiels De Defense : Pour Un Cadre D'Analyse Issu De L'Economie Spatiale , 2012 .

[5]  J. Haddad,et al.  Success of long-term preventive maintenance on telescope subsystems using the example of the VLT adapter-rotators at the ESO Paranal Observatory , 2012, Other Conferences.

[6]  Frédéric Gonté,et al.  Paranal instruments: installation, maintenance, optimization, and operation , 2012, Other Conferences.

[7]  Vittorio Nurzia VLT unit telescopes performance monitoring , 2018, Astronomical Telescopes + Instrumentation.

[8]  Andreas Kaufer La Silla Paranal Observatory operations , 2008, Astronomical Telescopes + Instrumentation.

[9]  Gerhard Hüdepohl,et al.  Obsolescence of electronics at the VLT , 2016, Astronomical Telescopes + Instrumentation.

[10]  A. Kaufer,et al.  VLT(I) instrument operations and maintenance at the Paranal Observatory , 2006, SPIE Astronomical Telescopes + Instrumentation.

[11]  Henri M. J. Boffin,et al.  Ensuring the Reliability and Performance of Instrumentation at the Paranal Observatory , 2014 .

[12]  Nelson Montano Maintenance management at La Silla Paranal Observatory , 2008, Astronomical Telescopes + Instrumentation.

[13]  Nelson Montano Paranal maintenance and CMMS experience , 2004, SPIE Astronomical Telescopes + Instrumentation.

[14]  Fernando Salgado,et al.  Ten years maintaining MACAO-VLTI units in operation in the Very Large Telescope at Paranal Observatory , 2016, Astronomical Telescopes + Instrumentation.

[15]  Julien Milli,et al.  Framework to use modern big data software tools to improve operations at the Paranal Observatory , 2018, Astronomical Telescopes + Instrumentation.

[16]  Sergio Gonzalez Reliability culture at La Silla Paranal Observatory , 2010, Astronomical Telescopes + Instrumentation.