Modeling and analysis of semiconductor manufacturing in a shrinking world: challenges and successes

A panel session on the role of modeling and analysis in semiconductor manufacturing in a shrinking world is presented. Therefore, two participants are from Asia, two from Europe, and two from US and there are two panel organizers/ moderators (Fowler and Monch). One panelist from each continent is from industry and one from academia. Only initial position statements are included in the proceedings. However, these initial statements form the basis for the panel discussion. The statements of the panelists from industry relate to modeling and analysis problems found in their own companies. The position statements of the panelists from academia describe the role that modeling and analysis is expected to play in their current and ongoing research in semiconductor manufacturing. Furthermore, their views on the challenges and successes of modeling and analysis in a globalized world are also included.

[1]  John W. Fowler,et al.  Genetic algorithm-based subproblem solution procedures for a modified shifting bottleneck heuristic for complex job shops , 2007, Eur. J. Oper. Res..

[2]  R. Uzsoy,et al.  A problem reduction approach for scheduling semiconductor wafer fabrication facilities , 2006, IEEE Transactions on Semiconductor Manufacturing.

[3]  Reha Uzsoy,et al.  Hybrid decomposition heuristics for solving large-scale scheduling problems in semiconductor wafer fabrication , 2007, J. Sched..

[4]  Chen-Fu Chien,et al.  Modeling strategic semiconductor assembly outsourcing decisions based on empirical settings , 2008, OR Spectr..

[5]  J. E. Rooda,et al.  Cycle time distributions of semiconductor workstations using aggregate modeling , 2009, Proceedings of the 2009 Winter Simulation Conference (WSC).

[6]  Lee W. Schruben,et al.  Operational modeling and simulation in semiconductor manufacturing , 1998, 1998 Winter Simulation Conference. Proceedings (Cat. No.98CH36274).

[7]  John W. Fowler,et al.  Development and analysis of a customer-demand-driven semiconductor supply chain model using the High Level Architecture , 2006, Int. J. Simul. Process. Model..

[8]  Jairo R. Montoya-Torres,et al.  A literature survey on the design approaches and operational issues of automated wafer-transport systems for wafer fabs , 2006 .

[9]  Zuhua Jiang,et al.  The infrastructure of the timed EOPNs-based multiple-objective real-time scheduling system for 300 mm wafer fab , 2007 .

[10]  John W. Fowler,et al.  Parameterization of fast and accurate simulations for complex supply networks , 2002, Proceedings of the Winter Simulation Conference.

[11]  Chen-Fu Chien Made in Taiwan: Shifting Paradigms in High-tech Industries , 2007 .

[12]  Donald E. Brown,et al.  Intelligent Scheduling Systems , 1995 .

[13]  Stephen John Turner,et al.  Analysis of a borderless fab using interoperating AutoSched AP models , 2007 .

[14]  Stéphane Dauzère-Pérès,et al.  Simulation results and formalism for global-local scheduling in semiconductor manufacturing facilities , 2007, 2007 Winter Simulation Conference.

[15]  Peter Lendermann,et al.  About the Need for Distributed Simulation Technology for the Resolution of Real-World Manufacturing and Logistics Problems , 2006, Proceedings of the 2006 Winter Simulation Conference.

[16]  G.K. Agrawal,et al.  A survey of automated material handling systems in 300-mm SemiconductorFabs , 2006, IEEE Transactions on Semiconductor Manufacturing.

[17]  Reha Uzsoy,et al.  A review of production planning and scheduling models in the semiconductor industry , 1994 .

[18]  M. Mathirajan,et al.  A literature review, classification and simple meta-analysis on scheduling of batch processors in semiconductor , 2006 .

[19]  Tae-Eog Lee,et al.  Semiconductor Manufacturing Automation , 2009, Handbook of Automation.

[20]  Robert C. Leachman,et al.  IMPReSS: An Automated Production-Planning and Delivery-Quotation System at Harris Corporation-Semiconductor Sector , 1996 .

[21]  Mark S. Fox,et al.  Intelligent Scheduling , 1998 .

[22]  Erhan Kutanoglu,et al.  Heuristic based scheduling system for diffusion in semiconductor manufacturing , 2009, Proceedings of the 2009 Winter Simulation Conference (WSC).

[23]  Shengwei Ding,et al.  Economic Efficiency Analysis of Wafer Fabrication , 2007, IEEE Transactions on Automation Science and Engineering.

[24]  Weiming Shen,et al.  A Multiagent-Based Decision-Making System for Semiconductor Wafer Fabrication With Hard Temporal Constraints , 2008, IEEE Transactions on Semiconductor Manufacturing.

[25]  Robert C. Leachman,et al.  Special Issue: Franz Edelman Award for Achievement in Operations Research and the Management Sciences: SLIM: Short Cycle Time and Low Inventory in Manufacturing at Samsung Electronics , 2002, Interfaces.

[26]  John W. Fowler,et al.  Semiconductor manufacturing scheduling and dispatching: State of the art and survey of needs , 2006 .

[27]  Murat Kulahci,et al.  Demand signal modelling: A short-range panel forecasting algorithm for semiconductor firm device-level demand , 2008 .

[28]  S. Sze Semiconductor Devices: Physics and Technology , 1985 .

[29]  Lars Mönch,et al.  The FABMAS multi-agent-system prototype for production control of water fabs: design, implementation and performance assessment , 2006 .

[30]  R. Uzsoy,et al.  Tractable nonlinear production planning models for semiconductor wafer fabrication facilities , 2006, IEEE Transactions on Semiconductor Manufacturing.

[31]  Stéphane Dauzère-Pérès,et al.  On the importance of sequencing decisions in production planning and scheduling , 2002 .

[32]  Rubén Ruiz,et al.  Operational planning and control of semiconductor wafer production , 2006 .

[33]  Robin G. Qiu A service-oriented integration framework for semiconductor manufacturing systems , 2007, Int. J. Manuf. Technol. Manag..

[34]  Reha Uzsoy,et al.  A REVIEW OF PRODUCTION PLANNING AND SCHEDULING MODELS IN THE SEMICONDUCTOR INDUSTRY PART I: SYSTEM CHARACTERISTICS, PERFORMANCE EVALUATION AND PRODUCTION PLANNING , 1992 .