Improvement of Process Productivity through Just-in-Time
暂无分享,去创建一个
Vasanth Kamath | Giridhar B Kamath | Rajesh R Pai | Sunith Hebbar | Rajesh R. Pai | G. Kamath | V. Kamath | Sunith Hebbar
[1] A O Mathew,et al. Systems Approach to Determine the Significance of the Critical Success Factors of a Knowledge Management System , 2012 .
[2] Ahmed Deif,et al. Computer simulation to manage lean manufacturing systems , 2010, 2010 2nd International Conference on Computer Engineering and Technology.
[3] Mehmet Savsar,et al. Simulation analysis of maintenance policies in just‐in‐time production systems , 1997 .
[4] Rekha Rani Chaudhary,et al. An inventory Model for deteriorating items with Weibull Deterioration with Time Dependent Demand and Shortages , 2013 .
[5] John D. Sterman,et al. System Dynamics: Systems Thinking and Modeling for a Complex World , 2002 .
[6] R G Coyle,et al. System Dynamics Modelling: A Practical Approach , 1996 .
[7] Kongala Ramprasad,et al. Motivation and Workforce Performance in Indian industries , 2013 .
[8] I. Winfield. Japanese manufacturing techniques , 1994 .
[9] K Rand Graham. Supply Chain Simulation: A System Dynamics Approach for Improving Performance , 2013 .
[10] Wing Bun Lee,et al. A study of system dynamics in just-in-time logistics , 2003 .
[11] Kah Wai Chan,et al. Supply chain management: A system dynamics approach to improve visibility and performance , 2011 .
[12] R. Schonberger. Japanese manufacturing techniques : nine hidden lessons simplicity , 1982 .
[13] Ashish Agarwal,et al. MODELING SUPPLY CHAIN PERFORMANCE VARIABLES , 2005 .
[14] Josefa Mula,et al. Supply Chain Simulation: A System Dynamics Approach for Improving Performance , 2011 .