Scheduling optimization of design stream line for production research and development projects
暂无分享,去创建一个
[1] Tyson R. Browning,et al. Design Process Sequencing With Competent Genetic Algorithms , 2007 .
[2] David E. Goldberg,et al. A Genetic Algorithm for Developing Modular Product Architectures , 2003 .
[3] M. Sacramento Quintanilla,et al. Skilled workforce scheduling in Service Centres , 2009, Eur. J. Oper. Res..
[4] Abe Zeid,et al. Mapping Product Design Specification for Mass Customization , 2006, J. Intell. Manuf..
[5] Robert Ian Whitfield,et al. Identifying and Evaluating Parallel Design Activities Using the Design Structure Matrix , 2005 .
[6] Alexandre Dolgui,et al. Integrated configurable equipment selection and line balancing for mass production with serial–parallel machining systems , 2014 .
[7] Jayashankar M. Swaminathan,et al. Product Line Design with Component Commonality and Cost-Reduction Effort , 2006, Manuf. Serv. Oper. Manag..
[8] David N. Ford,et al. Product development resource allocation with foresight , 2005, Eur. J. Oper. Res..
[9] Majid Sabzehparvar,et al. A mathematical model for the multi-mode resource-constrained project scheduling problem with mode dependent time lags , 2008, The Journal of Supercomputing.
[10] Steve Caplin,et al. Principles Of Design , 2011 .
[11] Rikard Söderberg,et al. Towards non-FEA-based deformation methods for evaluating perceived quality of split-lines , 2013 .
[12] S Sharma. A procedure for benchmarking in multi-product manufacturing , 2007 .
[13] X. Cai,et al. A genetic algorithm for scheduling staff of mixed skills under multi-criteria , 2000, Eur. J. Oper. Res..
[14] Bassem Jarboui,et al. A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems , 2008, Appl. Math. Comput..
[15] Xuening Chu,et al. Task assignment with multiskilled employees and multiple modes for product development projects , 2012 .
[16] Tomoyuki Miyashita,et al. Evaluation of industrial machine design improvement ideas using characteristic-based hierarchical optimisation strategies , 2013 .
[17] Soumojit Kumar,et al. A heuristic-based approach to integrate the product line selection decision to the supply chain configuration , 2013 .
[18] Moustapha Diaby,et al. Development and evaluation of an assignment heuristic for allocating cross-trained workers , 2002, Eur. J. Oper. Res..
[19] Yongtae Park,et al. An analytic network process approach to measuring design change impacts in modular products , 2010 .
[20] Y. F. Zhang,et al. A hybrid particle swarm based method for process planning optimisation , 2012 .
[21] Eun Suk Suh,et al. Flexible platform component design under uncertainty , 2007, J. Intell. Manuf..
[22] David Wallace,et al. Assessing the quality of ideas from prolific, early-stage product ideation , 2013 .
[23] Juite Wang,et al. A fuzzy robust scheduling approach for product development projects , 2004, Eur. J. Oper. Res..
[24] J. Scott. A strategy for modelling the design-development phase of a product , 1999 .