장경간 Spliced PSC 거더교량의 개발
暂无分享,去创建一个
Prestressed concrete I-girders were used in the bridge applications in the early 1950s. During the last four decades, the most widely used girder length of bridges have been below 30meters. The main objective of this study is to develope the alternative section for long span bridge which exceed 40 meters. The developed Bulb-Tee girder has a wide bottom flange to enhance the compressive strength and to allow placement of a large number of strands in the bottom flange. New bulb-tee shaped PSC girder sections are proposed in this paper. Splicing the technique for long span bridge girder to reduce the self weight is also proposed.