Project UHV.-Construction and Technical Plan
暂无分享,去创建一个
[1] Howard R. Lucas,et al. Outdoor 2550-Bil Shielded Precision Gas Capacitor , 1970 .
[2] D. D. MacCarthy,et al. New Method of Simulating Rainfall in High-Voltage Testing , 1969 .
[3] S. B. Griscom,et al. The Apple Grove 750-kV Project- Equipment Design and Instrumentation , 1965 .
[4] A. H. Foley,et al. Project EHV-preliminary corona investigations: the effect of harmonics on corona losses , 1960, Transactions of the American Institute of Electrical Engineers. Part III: Power Apparatus and Systems.
[5] C. F. Wagner,et al. Corona Investigation on Extra-High-Voltage Lines-500-Kv Test Project of the American Gas and Electric Company , 1951, Transactions of the American Institute of Electrical Engineers.
[6] D. D. MacCarthy,et al. Radio Noise and Corona Loss Results from Project EHV , 1963 .