The effect of bidding success in construction bidding

Purpose – Winning a bid will carry implications for capacity level of a construction firm. This paper aims to examine the impact of a winning bid on contractors' bid pricing strategies.Design/methodology/approach – In identifying the specific types of bidding trends before and after a winning bid, the variations in bids are expressed as a function of time relative to winning bid – the “event” of interest in this study – using a piecewise mixed effects model. The bids analysed comprised series of bids with a winning bid in between, recorded from Hong Kong building contractors.Findings – The results show that there is a relationship between bid price and bidding success. The bidders in general bid low for time periods before a winning bid and they are less competitive in time periods after a winning bid. However, by considering the individual bidders' characteristics that relate to differences in bidding competitiveness, it is shown that there is remarkable heterogeneity among the bidders in bid pricing dec...

[1]  Martin Skitmore,et al.  Tendering theory revisited , 1999 .

[2]  Goran Runeson,et al.  Competitor analysis in construction bidding , 2010 .

[3]  Derek Stephen Drew The effect of contract type and size on competitiveness in construction contract bidding , 1994 .

[4]  Derek S. Drew,et al.  Modeling the Heterogeneity in Contractors’ Mark-Up Behavior , 2010 .

[5]  Martin Skitmore,et al.  Changes in profit as market conditions change: An historical study of a building firm , 1996 .

[6]  Robert I. Carr,et al.  Bidding Strategy Using Multiple Regression , 1978 .

[7]  Martin Skitmore,et al.  Pricing construction work: a marketing viewpoint , 2007 .

[8]  J. Kagel,et al.  Bidding in Common Value Auctions: How the Commercial Construction Industry Corrects for the Winner's Curse , 1996 .

[9]  A. Shash Factors considered in tendering decisions by top UK contractors , 1993 .

[10]  W. Härdle Applied Nonparametric Regression , 1991 .

[11]  M. Gates Bidding Strategies and Probabilities , 1967 .

[12]  Martin Skitmore,et al.  Bidding models: testing the stationarity assumption , 2006 .

[13]  David Lowe,et al.  A logistic regression approach to modelling the contractor's decision to bid , 2004 .

[14]  G. Molenberghs,et al.  Linear Mixed Models for Longitudinal Data , 2001 .

[15]  Roger Flanagan,et al.  Sealed bid auctions: an application to the building industry , 1985 .

[16]  M. Skitmore,et al.  Construction price formation: full‐cost pricing or neoclassical microeconomic theory? , 2006 .

[17]  Aminah Robinson Fayek,et al.  A survey of the bidding practices of Canadian civil engineering construction contractors , 1999 .

[18]  Derek S. Drew,et al.  The effect of experience on contractors' competitiveness in recurrent bidding , 2002 .

[19]  N M Laird,et al.  Tutorial in Biostatistics: Evaluating the impact of 'critical periods' in longitudinal studies of growth using piecewise mixed effects models. , 2001, International journal of epidemiology.

[20]  Derek S. Drew,et al.  Modelling contractors' mark‐up behaviour in different construction markets , 2007 .

[21]  Richard de Neufville,et al.  Bidding Models: Effects of Bidders' Risk Aversion , 1977 .

[22]  Derek S. Drew,et al.  Heterogeneous Approach to Modeling Contractors' Decision-to-Bid Strategies , 2008 .

[23]  J. Ware,et al.  Applied Longitudinal Analysis , 2004 .

[24]  S. Lippman,et al.  HETEROGENEITY UNDER COMPETITION , 1991 .

[25]  Derek S. Drew,et al.  Applying a random coefficients logistic model to contractors' decision to bid , 2007 .

[26]  Goran Runeson,et al.  An analysis of the accuracy of estimating and the distribution of tenders , 1988 .

[27]  Christine Pasquire,et al.  The effect of competitive tendering on value in construction , 1997 .

[28]  Irtishad Ahmad,et al.  Questionnaire Survey on Bidding in Construction , 1988 .

[29]  R. Fellows,et al.  An examination of the importance of resource considerations when contractors make project selection decisions , 1992 .