Joint optimization of lot sizing and condition-based maintenance for multi-component production systems

Abstract This paper presents a joint optimization model of production lot sizing and condition-based maintenance for a multi-component production system which produces the products to meet the demand in a finite time horizon. The components in the system deteriorate gradually with usage and age. To evaluate the conditions of components, inspections are carried out after each production run. The condition-based maintenance decision-making rules are based not only on the predictive reliability but also on the structural importance of each component. Moreover, the economic dependency among components is also considered when performing corrective maintenance actions. The preventive maintenance cost, the corrective maintenance cost, the setup cost, the inspection cost, the inventory holding cost and the shortage cost are considered in this paper. The aim is to minimize the total cost by jointly optimizing two decision variables: the production lot size and the preventive maintenance threshold. The optimal joint policy is obtained by coupling simulation model and genetic algorithm. Finally, the use and advantages of our model are illustrated through a case study of a cluster tool.

[1]  Viliam Makis,et al.  Joint optimal lot sizing and preventive maintenance policy for a production facility subject to condition monitoring , 2015 .

[2]  Felix T.S. Chan,et al.  Maintenance policy selection in manufacturing firms using the fuzzy MCDM approach , 2012 .

[3]  Nagi Gebraeel,et al.  Stochastic modeling and real-time prognostics for multi-component systems with degradation rate interactions , 2014 .

[4]  Djamil Aïssani,et al.  Preventive maintenance scheduling for a multi-component system with non-negligible replacement time , 2010, Int. J. Syst. Sci..

[5]  Christophe Bérenguer,et al.  Dynamic grouping maintenance with time limited opportunities , 2013, Reliab. Eng. Syst. Saf..

[6]  A. Seidmann,et al.  Production lot sizing with machine breakdowns , 1992 .

[7]  Antoine Grall,et al.  Condition-based maintenance for multi-component systems using importance measure and predictive information , 2014 .

[8]  Viliam Makis,et al.  Optimal lot-sizing and maintenance policy for a partially observable production system , 2016, Comput. Ind. Eng..

[9]  Hao Peng,et al.  Joint optimization of condition-based maintenance and production lot-sizing , 2016, Eur. J. Oper. Res..

[10]  Shib Sankar Sana,et al.  A mathematical model on EPQ for stochastic demand in an imperfect production system , 2013 .

[11]  Emanuele Borgonovo,et al.  Production , Manufacturing and Logistics A new time-independent reliability importance measure , 2016 .

[12]  Shaomin Wu,et al.  A cost-based importance measure for system components: An extension of the Birnbaum importance , 2013, Eur. J. Oper. Res..

[13]  Gholamreza Jalali-Naini,et al.  Combining a maintenance center M/M/c/m queue into the economic production quantity model with stochastic machine breakdowns and repair , 2012, Comput. Ind. Eng..

[14]  Fazel Ansari Chaharsoughi Meta-analysis of knowledge assets for continuous improvement of maintenance cost controlling , 2014 .

[15]  Fazel Ansari,et al.  Problem-solving approaches in maintenance cost management: a literature review , 2016 .

[16]  Ling Li,et al.  Joint optimisation of production rate and preventive maintenance in machining systems , 2016 .

[17]  Khac Tuan Huynh,et al.  A Reliability-based Opportunistic Predictive Maintenance Model for K-out-of-n Deteriorating Systems , 2013 .

[18]  Shaomin Wu,et al.  Linking component importance to optimisation of preventive maintenance policy , 2016, Reliab. Eng. Syst. Saf..

[19]  Antoine Grall,et al.  Optimization of replacement times using imperfect monitoring information , 2003, IEEE Trans. Reliab..

[20]  Jianchao Zeng,et al.  Real-time prediction of remaining useful life and preventive opportunistic maintenance strategy for multi-component systems considering stochastic dependence , 2016, Comput. Ind. Eng..

[21]  H. Wee,et al.  Economic production quantity models for deteriorating items with rework and stochastic preventive maintenance time , 2012 .

[22]  N. E. Abboud A discrete-time Markov production-inventory model with machine breakdowns , 2001 .

[23]  Christophe Bérenguer,et al.  Grouping maintenance strategy with availability constraint under limited repairmen , 2012 .

[24]  Phuc Do,et al.  A Stationary Grouping Maintenance Strategy Using Mean Residual Life and the Birnbaum Importance Measure for Complex Structures , 2016, IEEE Transactions on Reliability.

[25]  Jan M. van Noortwijk,et al.  A survey of the application of gamma processes in maintenance , 2009, Reliab. Eng. Syst. Saf..

[26]  Rommert Dekker,et al.  Optimal maintenance of multi-component systems: a review , 2008 .

[27]  Christophe Bérenguer,et al.  Condition-based dynamic maintenance operations planning & grouping. Application to commercial heavy vehicles , 2011, Reliab. Eng. Syst. Saf..

[28]  Sami El-Ferik,et al.  Economic production lot-sizing for an unreliable machine under imperfect age-based maintenance policy , 2008, Eur. J. Oper. Res..

[29]  Zbigniew Michalewicz,et al.  Genetic Algorithms + Data Structures = Evolution Programs , 1996, Springer Berlin Heidelberg.

[30]  Gwo-Liang Liao,et al.  Joint production and maintenance strategy for economic production quantity model with imperfect production processes , 2013, J. Intell. Manuf..