Determining Replenishment Lot Size and Shipment Policy for an EPQ Inventory Model with Delivery and Rework

The determination of production-shipment policies for a vendor-buyer system is dealt within this paper. The main objective is to derive the optimal replenishment lot size and shipment policy for an EPQ inventory model with multiple deliveries and rework. This inventory model contains two decision variables: the replenishment lot size and the number of deliveries. Previous researches solve this inventory model considering both variables to be continuous. However, the number of deliveries must be considered as a discrete variable. In this direction, this paper solves the inventory model considering two cases: Case 1: the replenishment lot size as a continuous variable and the number of shipments as a discrete variable and Case 2: the replenishment lot size and the number of shipments as discrete variables. The final results are two simple and easy-to-apply solution procedures to find the optimal values for the replenishment lot size and the number of deliveries for each case.

[1]  Shib Sankar Sana,et al.  A mathematical model on EPQ for stochastic demand in an imperfect production system , 2013 .

[2]  Leopoldo Eduardo Cárdenas-Barrón,et al.  The derivation of EOQ/EPQ inventory models with two backorders costs using analytic geometry and algebra , 2011 .

[3]  S. Sana,et al.  A stochastic inventory model with product recovery , 2013 .

[4]  Hui-Ming Wee,et al.  The economic lot size of the integrated vendor‐buyer inventory system derived without derivatives , 2002 .

[5]  Hui-Ming Wee,et al.  TECHNICAL NOTE A MODIFIED EOQ MODEL WITH TEMPORARY SALE PRICE DERIVED WITHOUT DERIVATIVES , 2003 .

[6]  Leopoldo Eduardo Cárdenas-Barrón,et al.  An improved solution to the replenishment policy for the EMQ model with rework and multiple shipments , 2013 .

[7]  M. Omar,et al.  An alternative approach to analyze economic ordering quantity and economic production quantity inventory problems using the completing the square method , 2010, Comput. Ind. Eng..

[8]  L. Cárdenas-Barrón,et al.  Multi products single machine EPQ model with immediate rework process , 2012 .

[9]  S. Sana An economic order quantity model for nonconforming quality products , 2012 .

[10]  Leopoldo Eduardo Cárdenas-Barrón,et al.  The integrality of the lot size in the basic EOQ and EPQ models: Applications to other production-inventory models , 2010, Appl. Math. Comput..

[11]  Leopoldo Eduardo Cárdenas-Barrón,et al.  Celebrating a century of the economic order quantity model in honor of Ford Whitman Harris , 2014 .

[12]  K. S. Chaudhuri,et al.  Maximising profits for an EPQ model with unreliable machine and rework of random defective items , 2013, Int. J. Syst. Sci..

[13]  Leopoldo Eduardo Cárdenas-Barrón,et al.  Joint determination of the lot size and number of shipments for a family of integrated vendor–buyer systems considering defective products , 2015, Int. J. Syst. Sci..

[14]  Hong-Dar Lin,et al.  Determination of production-shipment policy using a two-phase algebraic approach , 2012 .

[15]  Ata Allah Taleizadeh,et al.  An improved solution to replenishment lot size problem with discontinuous issuing policy and rework, and the multi-delivery policy into economic production lot size problem with partial rework , 2012, Expert Syst. Appl..

[16]  Ford W. Harris,et al.  How Many Parts to Make at Once , 1990, Oper. Res..

[17]  M.-F. Wu,et al.  Determining replenishment lot size and shipment policy for an extended EPQ model with delivery and quality assurance issues , 2011 .

[18]  Biswajit Sarkar,et al.  Easy and Improved Algorithms to Joint Determination of the Replenishment Lot Size and Number of Shipments for an Epq Model with Rework , 2013 .

[19]  Ata Allah Taleizadeh,et al.  DETERMINING OPTIMAL PRICE, REPLENISHMENT LOT SIZE AND NUMBER OF SHIPMENTS FOR AN EPQ MODEL WITH REWORK AND MULTIPLE SHIPMENTS , 2015 .

[20]  Monami Das Roy,et al.  An economic production lot size model for defective items with stochastic demand, backlogging and rework , 2014 .

[21]  Yan-Chun Chen An optimal production and inspection strategy with preventive maintenance error and rework , 2013 .