Determining Replenishment Lot Size and Shipment Policy for an EPQ Inventory Model with Delivery and Rework
暂无分享,去创建一个
[1] Shib Sankar Sana,et al. A mathematical model on EPQ for stochastic demand in an imperfect production system , 2013 .
[2] Leopoldo Eduardo Cárdenas-Barrón,et al. The derivation of EOQ/EPQ inventory models with two backorders costs using analytic geometry and algebra , 2011 .
[3] S. Sana,et al. A stochastic inventory model with product recovery , 2013 .
[4] Hui-Ming Wee,et al. The economic lot size of the integrated vendor‐buyer inventory system derived without derivatives , 2002 .
[5] Hui-Ming Wee,et al. TECHNICAL NOTE A MODIFIED EOQ MODEL WITH TEMPORARY SALE PRICE DERIVED WITHOUT DERIVATIVES , 2003 .
[6] Leopoldo Eduardo Cárdenas-Barrón,et al. An improved solution to the replenishment policy for the EMQ model with rework and multiple shipments , 2013 .
[7] M. Omar,et al. An alternative approach to analyze economic ordering quantity and economic production quantity inventory problems using the completing the square method , 2010, Comput. Ind. Eng..
[8] L. Cárdenas-Barrón,et al. Multi products single machine EPQ model with immediate rework process , 2012 .
[9] S. Sana. An economic order quantity model for nonconforming quality products , 2012 .
[10] Leopoldo Eduardo Cárdenas-Barrón,et al. The integrality of the lot size in the basic EOQ and EPQ models: Applications to other production-inventory models , 2010, Appl. Math. Comput..
[11] Leopoldo Eduardo Cárdenas-Barrón,et al. Celebrating a century of the economic order quantity model in honor of Ford Whitman Harris , 2014 .
[12] K. S. Chaudhuri,et al. Maximising profits for an EPQ model with unreliable machine and rework of random defective items , 2013, Int. J. Syst. Sci..
[13] Leopoldo Eduardo Cárdenas-Barrón,et al. Joint determination of the lot size and number of shipments for a family of integrated vendor–buyer systems considering defective products , 2015, Int. J. Syst. Sci..
[14] Hong-Dar Lin,et al. Determination of production-shipment policy using a two-phase algebraic approach , 2012 .
[15] Ata Allah Taleizadeh,et al. An improved solution to replenishment lot size problem with discontinuous issuing policy and rework, and the multi-delivery policy into economic production lot size problem with partial rework , 2012, Expert Syst. Appl..
[16] Ford W. Harris,et al. How Many Parts to Make at Once , 1990, Oper. Res..
[17] M.-F. Wu,et al. Determining replenishment lot size and shipment policy for an extended EPQ model with delivery and quality assurance issues , 2011 .
[18] Biswajit Sarkar,et al. Easy and Improved Algorithms to Joint Determination of the Replenishment Lot Size and Number of Shipments for an Epq Model with Rework , 2013 .
[19] Ata Allah Taleizadeh,et al. DETERMINING OPTIMAL PRICE, REPLENISHMENT LOT SIZE AND NUMBER OF SHIPMENTS FOR AN EPQ MODEL WITH REWORK AND MULTIPLE SHIPMENTS , 2015 .
[20] Monami Das Roy,et al. An economic production lot size model for defective items with stochastic demand, backlogging and rework , 2014 .
[21] Yan-Chun Chen. An optimal production and inspection strategy with preventive maintenance error and rework , 2013 .