SOLVING PROCESS PLANNING, WEIGHTED APPARENT TARDINESS COST DISPATCHING, AND WEIGHTED PROCESSING PLUS WEIGHT DUE-DATE ASSIGNMENT SIMULTANEOUSLY USING A HYBRID SEARCH
暂无分享,去创建一个
Halil Ibrahim Demir | Caner Erden | Mumtaz Ipek | Abdullah Hulusi Kökçam | Abdullah Hulusi Kokcam | C. Erden | M. İpek
[1] Y W Guo,et al. Optimisation of integrated process planning and scheduling using a particle swarm optimisation approach , 2009 .
[2] Kanji Ueda,et al. An Emergent Synthesis Approach to Simultaneous Process Planning and Scheduling , 2007 .
[3] C. T. Ng,et al. Group scheduling and due date assignment on a single machine , 2011 .
[4] Hong-Chao Zhang,et al. An integrated model of process planning and production scheduling , 1994 .
[5] Jim Hutchison,et al. Scheduling approaches for random job shop flexible manufacturing systems , 1991 .
[6] Frank Werner,et al. Scheduling with common due date, earliness and tardiness penalties for multimachine problems: A survey , 2004, Math. Comput. Model..
[7] Hong Chul Lee,et al. Integration of Process Planning and Scheduling Using Simulation Based Genetic Algorithms , 2001 .
[8] Shuo-Yan Chou,et al. Meta-heuristic approaches for minimizing total earliness and tardiness penalties of single-machine scheduling with a common due date , 2007, J. Heuristics.
[9] Andreas C. Nearchou,et al. A differential evolution approach for the common due date early/tardy job scheduling problem , 2008, Comput. Oper. Res..
[10] Kuo-Ching Ying,et al. Minimizing earliness-tardiness penalties for common due date single-machine scheduling problems by a recovering beam search algorithm , 2008, Comput. Ind. Eng..
[11] Jose A. Ventura,et al. Single machine scheduling with symmetric earliness and tardiness penalties , 2003, Eur. J. Oper. Res..
[12] T. C. Edwin Cheng,et al. Single-machine batch delivery scheduling with an assignable common due date and controllable processing times , 2013, Comput. Ind. Eng..
[13] Behrokh Khoshnevis,et al. Integration of process planning and scheduling functions , 1991, J. Intell. Manuf..
[14] S. S. Panwalkar,et al. Common Due Date Assignment to Minimize Total Penalty for the One Machine Scheduling Problem , 1982, Oper. Res..
[15] T. C. Edwin Cheng,et al. Two-agent single-machine scheduling with assignable due dates , 2012, Appl. Math. Comput..
[16] Gur Mosheiov,et al. A common due-date assignment problem on parallel identical machines , 2001, Comput. Oper. Res..
[17] Cheng Wu,et al. A hybrid local search algorithm for scheduling real-world job shops with batch-wise pending due dates , 2012, Eng. Appl. Artif. Intell..
[18] Dirk Biskup,et al. Common due date assignment for scheduling on a single machine with jointly reducible processing times , 2001 .
[19] C. T. Ng,et al. Scheduling deteriorating jobs with CON/SLK due date assignment on a single machine , 2011 .
[20] Manish Kumar,et al. Integration of process planning and scheduling in a job shop environment , 2006 .
[21] Chengbin Chu,et al. Due date assignment and scheduling: Slk, TWK and other due date assignment models , 2002 .
[22] Jesuk Ko,et al. A symbiotic evolutionary algorithm for the integration of process planning and job shop scheduling , 2003, Comput. Oper. Res..
[23] Behrokh Khoshnevis,et al. Scheduling with flexible process plans , 1993 .
[24] Dehua Xu,et al. Setting due dates to minimize the total weighted possibilistic mean value of the weighted earliness-tardiness costs on a single machine , 2011, Comput. Math. Appl..
[25] Fuqing Zhao,et al. Integration of Process Planning and Production Scheduling Based on A Hybrid PSO and SA Algorithm , 2006, 2006 International Conference on Mechatronics and Automation.
[26] W. E. I. Ta N,et al. Integration of process planning and schedulingÐ a review , 2000 .
[27] S. M. T. Fatemi Ghomi,et al. Due-date assignment and machine scheduling in a low machine-rate situation with stochastic processing times , 2013, Comput. Oper. Res..
[28] Rakesh Kumar Phanden,et al. Integration of process planning and scheduling: a state-of-the-art review , 2011, Int. J. Comput. Integr. Manuf..
[29] V. Vinod,et al. Simulation modeling and analysis of due-date assignment methods and scheduling decision rules in a dynamic job shop production system , 2011 .
[30] K. L. Mak,et al. A hybrid Hopfield network-genetic algorithm approach to optimal process plan selection , 2000 .
[31] Pius J. Egbelu,et al. SCHEDULING IN A PRODUCTION ENVIRONMENT WITH MULTIPLE PROCESS PLANS PER JOB , 1999 .
[32] Paolo Brandimarte. Exploiting process plan flexibility in production scheduling: A multi-objective approach , 1999, Eur. J. Oper. Res..
[33] Norhashimah Morad,et al. Genetic algorithms in integrated process planning and scheduling , 1999, J. Intell. Manuf..
[34] Dvir Shabtay,et al. Scheduling and due date assignment to minimize earliness, tardiness, holding, due date assignment and batch delivery costs , 2010 .
[35] Elsayed A. Elsayed,et al. Job shop scheduling with alternative machines , 1990 .
[36] Ameur Soukhal,et al. Due dates assignment and JIT scheduling with equal-size jobs , 2010, Eur. J. Oper. Res..
[37] Vitaly A. Strusevich,et al. Single machine scheduling and due date assignment with positionally dependent processing times , 2009, Eur. J. Oper. Res..
[38] Dehua Xu,et al. Single machine due date assignment scheduling problem with customer service level in fuzzy environment , 2010, Appl. Soft Comput..
[39] Wieslaw Kubiak,et al. Single Machine Scheduling with Release and Due Date Assignment to Minimize the Weighted Number of Late Jobs , 1998, Inf. Process. Lett..
[40] Hemmak Allaoua,et al. Variable Parameters Lengths Genetic Algorithm for Minimizing Earliness-Tardiness Penalties of Single Machine Scheduling With a Common Due Date , 2010, Electron. Notes Discret. Math..
[41] Juichin Jiang,et al. Mathematical programming for the scheduling problem with alternate process plans in FMS , 1994 .
[42] T. C. Edwin Cheng,et al. Common due date assignment and scheduling with a rate-modifying activity to minimize the due date, earliness, tardiness, holding, and batch delivery cost , 2012, Comput. Ind. Eng..
[43] Chiung Moon,et al. Integrated process planning and scheduling in a supply chain , 2008, Comput. Ind. Eng..
[44] Halil Ibrahim Demir,et al. Process Planning and Scheduling with SLK Due-Date Assignment where Earliness , Tardiness and Due-Dates are Punished , 2014 .
[45] Ji-Bo Wang. Single machine scheduling with common due date and controllable processing times , 2006, Appl. Math. Comput..
[46] Yu Xia,et al. Job sequencing and due date assignment in a single machine shop with uncertain processing times , 2008, Eur. J. Oper. Res..
[47] Gur Mosheiov,et al. A note on a due-date assignment on a two-machine flow-shop , 2004, Comput. Oper. Res..
[48] Halil Ibrahim Demir,et al. Process Planning and Due-date Assignment with ATC Dispatching where Earliness , Tardiness and Due-dates are Punished , 2014 .
[49] Chengbin Chu,et al. A survey of the state-of-the-art of common due date assignment and scheduling research , 2002, Eur. J. Oper. Res..
[50] Costas P. Pappis,et al. Scheduling under a common due-data on parallel unrelated machines , 1998, Eur. J. Oper. Res..
[51] T. C. Edwin Cheng,et al. Batch Scheduling and Common Due-date Assignment on a Single Machine , 1996, Discret. Appl. Math..