A probabilistic approach for earthquake risk assessment based on an engineering insurance portfolio

This paper presents the construction classification of the existing engineering covers in Taiwan. The exposure profile and variable vulnerability during different construction phases are established for some kinds of classes of construction. Finally, we present a method and framework to estimate the probable maximum loss of engineering insurance portfolio during an earthquake with consideration of the dynamic nature of structural changes and exposure values during a construction project.

[1]  W. Chiang,et al.  An integrated flood risk assessment model for property insurance industry in Taiwan , 2011 .

[2]  Chen-Yuan Chen,et al.  Using Lego NXT to explore scientific literacy in disaster prevention and rescue systems , 2012, Natural Hazards.

[3]  Cheng-Wu Chen,et al.  Stability conditions of fuzzy systems and its application to structural and mechanical systems , 2006, Adv. Eng. Softw..

[4]  Chung-Hung Tsai,et al.  Development of a Mechanism for Typhoon- and Flood-risk Assessment and Disaster Management in the Hotel Industry – A Case Study of the Hualien Area , 2011 .

[5]  Wen-Ko Hsu,et al.  A novel strategy to determine the insurance and risk control plan for natural disaster risk management , 2012, Natural Hazards.

[6]  Yi-Ping Hung,et al.  The construction of a high-resolution visual monitoring for hazard analysis , 2013, Natural Hazards.

[7]  Cheng-Wu Chen,et al.  Kalman filter decision systems for debris flow hazard assessment , 2012, Natural Hazards.

[8]  Meng-Lung Lin,et al.  A new viewpoint of hazard assessment and management for Taiwan’s insurance issues , 2012, Natural Hazards.

[9]  Huicong Jia,et al.  Resilience to natural hazards: a geographic perspective , 2010 .

[10]  Cheng-Wu Chen,et al.  Hazard management and risk design by optimal statistical analysis , 2012, Natural Hazards.

[11]  Chun-Pin Tseng,et al.  Default risk-based probabilistic decision model for risk management and control , 2012, Natural Hazards.

[12]  Cheng-Wu Chen,et al.  Modeling and control for nonlinear structural systems via a NN-based approach , 2009, Expert Syst. Appl..

[13]  Cheng-Wu Chen,et al.  Modeling and assessment of bridge structure for seismic hazard prevention , 2012, Natural Hazards.

[14]  Didier Gourc,et al.  Towards a multi-dimensional project Performance Measurement System , 2010, Decis. Support Syst..

[15]  Cheng-Wu Chen,et al.  Application of Fuzzy-model-based Control to Nonlinear Structural Systems with Time Delay: an LMI Method , 2010 .

[16]  Chung-Hung Tsai,et al.  The establishment of a rapid natural disaster risk assessment model for the tourism industry , 2011 .

[17]  Han-Chung Yang,et al.  Potential hazard analysis from the viewpoint of flow measurement in large open-channel junctions , 2012, Natural Hazards.

[18]  David Etkin,et al.  People and community as constituent parts of hazards: the significance of societal dimensions in hazards analysis , 2007 .

[19]  Chen-Yuan Chen Assessment of the major hazard potential of interfacial solitary waves moving over a trapezoidal obstacle on a horizontal plateau , 2012, Natural Hazards.

[20]  Cheng-Wu Chen,et al.  Risk and uncertainty analysis in the planning stages of a risk decision-making process , 2012, Natural Hazards.

[21]  Cheng-Wu Chen,et al.  RETRACTED: Risk control allocation model for pressure vessels and piping project , 2012 .

[22]  Cheng-Wu Chen,et al.  T-S fuzzy controllers for nonlinear interconnected systems with multiple time delays , 2005, IEEE Trans. Circuits Syst. I Regul. Pap..

[23]  Cheng-Wu Chen,et al.  Stability analysis of an oceanic structure using the Lyapunov method , 2010 .

[24]  Cheng-Wu Chen,et al.  Stability analysis of T-S fuzzy models for nonlinear multiple time-delay interconnected systems , 2004, Math. Comput. Simul..

[25]  Cheng-Wu Chen,et al.  Stability analysis and robustness design of nonlinear systems: An NN-based approach , 2011, Appl. Soft Comput..

[26]  Cheng-Wu Chen,et al.  Potential hazard analysis and risk assessment of debris flow by fuzzy modeling , 2012, Natural Hazards.

[27]  Cheng-Wu Chen,et al.  Fuzzy Control for an Oceanic Structure: A Case Study in Time-delay TLP System , 2010 .

[28]  H Y Kim,et al.  STATISTICAL ANALYSIS OF FRAGILITY CURVES , 2000 .

[29]  Chen-Yuan Chen,et al.  Disaster prevention and reduction for exploring teachers’ technology acceptance using a virtual reality system and partial least squares techniques , 2012, Natural Hazards.

[30]  Cheng-Wu Chen,et al.  Robust stabilization of nonlinear multiple time-delay large-scale systems via decentralized fuzzy control , 2005, IEEE Trans. Fuzzy Syst..

[31]  Chun-Pin Tseng,et al.  A new viewpoint on risk control decision models for natural disasters , 2011 .

[32]  Anne van der Veen,et al.  Flood risk perceptions and spatial multi-criteria analysis: an exploratory research for hazard mitigation , 2008 .

[33]  Chung-Hung Tsai,et al.  An earthquake disaster management mechanism based on risk assessment information for the tourism industry-a case study from the island of Taiwan , 2010 .

[34]  Cheng-Wu Chen,et al.  Natural disaster management mechanisms for probabilistic earthquake loss , 2012, Natural Hazards.