Optimal dispatching control of an AGV in a JIT production system
暂无分享,去创建一个
[1] Sheldon M. Ross,et al. Finite-Stage Models , 1983 .
[2] Luis G. Occen˜A,et al. Modelling of an automated guided vehicle system (AG VS) in a just-in-time (JIT) environment , 1991 .
[3] Henk Tijms,et al. Stochastic modelling and analysis: a computational approach , 1986 .
[4] R. F. Brown,et al. PERFORMANCE EVALUATION , 2019, ISO 22301:2019 and business continuity management – Understand how to plan, implement and enhance a business continuity management system (BCMS).
[5] S. Balasmo,et al. Closed queueing networks with finite capacities: blocking types, product-form solution and performance indices , 1991 .
[6] Pius J. Egbelu,et al. Characterization of automatic guided vehicle dispatching rules , 1984 .
[7] J. M. A. Tanchoco,et al. An economic model for determining AGV fleet size , 1992 .
[8] Pius J. Egbelu. Economic design of unit load-based FMSs employing AGVs for transport , 1993 .
[9] Raif O. Onvural,et al. A Note on the Product Form Solutions of Multiclass Closed Queueing Networks with Blocking , 1989, Perform. Evaluation.
[10] Simonetta Balsamo,et al. Closed Queueing Networks with Finite Capacities: Blocking Types, Product-Form Solution and Performance Indices , 1991, Perform. Evaluation.
[11] J. A. Buzacott,et al. Models of flexible manufacturing systems with limited local buffers , 1986 .