An application of WASPAS method in risk qualitative analysis: a case study of a road construction project in Iran

[1]  Ali Kokangül,et al.  A new approximation for risk assessment using the AHP and Fine Kinney methodologies , 2017 .

[2]  Edmundas Kazimieras Zavadskas,et al.  Selection of Facade's Alternatives of Commercial and Public Buildings Based on Multiple Criteria , 2011 .

[3]  Ibrahim Mahamid,et al.  Risk matrix for factors affecting time delay in road construction projects: owners' perspective , 2011 .

[4]  Amir Mohammadi,et al.  Risk management workshop application: a case study of Ahwaz Urban Railway project , 2018 .

[5]  Osman Taylan,et al.  Construction projects selection and risk assessment by fuzzy AHP and fuzzy TOPSIS methodologies , 2014, Appl. Soft Comput..

[6]  C. E. SHANNON,et al.  A mathematical theory of communication , 1948, MOCO.

[7]  Jurgita Antucheviciene,et al.  A Hybrid Model Based on Fuzzy AHP and Fuzzy WASPAS for Construction Site Selection , 2015, Int. J. Comput. Commun. Control.

[8]  Dengsheng Wu,et al.  Measuring the Effect of Project Risks Based on Shapley Value for Project Risk Response , 2016 .

[9]  Peide Liu,et al.  Research on the supplier selection of a supply chain based on entropy weight and improved ELECTRE-III method , 2011 .

[10]  E. Zavadskas,et al.  Optimization of Weighted Aggregated Sum Product Assessment , 2012 .

[11]  Raufdeen Rameezdeen,et al.  Risk management in road construction: The case of Sri Lanka , 2009 .

[12]  Ahmet Öztaş,et al.  Risk analysis in fixed-price design–build construction projects , 2004 .

[13]  John F. Y. Yeung,et al.  Developing a fuzzy risk assessment model for guaranteed maximum price and target cost contracts in construction , 2011 .

[14]  Qian Shi,et al.  Delivery risk analysis within the context of program management using fuzzy logic and DEA: A China case study , 2014 .

[15]  Ammar Peter Kaka,et al.  Regression modelling of risk impacts on construction cost flow forecast , 2012 .

[16]  Zenonas Turskis,et al.  Multi-Criteria Selection of a Deep-Water Port in Klaipeda , 2013 .

[17]  Qianzhi Dai,et al.  A Single DEA-based Indicator for Assessing the Multiple Negative Effects of Project Risks , 2016 .

[18]  Amir-Hossein Khameneh,et al.  Offering a Framework for Evaluating the Performance of Project Risk Management System , 2016 .

[19]  Agnieszka Dziadosz,et al.  Risk Analysis in Construction Project - Chosen Methods , 2015 .

[20]  Nicholas Chileshe,et al.  An evaluation of risk factors impacting construction projects in Ghana , 2012 .