Integration of Production Planning and Scheduling Based on RTN Representation under Uncertainties
暂无分享,去创建一个
[1] Zineb Ibn Majdoub Hassani,et al. New Approach to Integrate Planning and Scheduling of Production System: Heuristic Resolution , 2018, International Journal of Engineering Research in Africa.
[2] Y Tian. Chemical production planning and scheduling integration under demand uncertainty , 2014 .
[3] R. Sargent,et al. The optimal operation of mixed production facilities—a general formulation and some approaches for the solution , 1996 .
[4] Cheng Hua. Supply chain planning model under uncertainty , 2004 .
[5] Michael Manitz,et al. Two-stage stochastic master production scheduling under demand uncertainty in a rolling planning environment , 2016 .
[6] Reha Uzsoy,et al. Rolling horizon procedures for the single machine deterministic total completion time scheduling problem with release dates , 1997, Ann. Oper. Res..
[7] Lei Xie,et al. Uncertain Production Scheduling Based on Fuzzy Theory Considering Utility and Production Rate , 2017, Inf..
[8] Qi Zhang,et al. Adaptation and approximate strategies for solving the lot-sizing and scheduling problem under multistage demand uncertainty , 2018, International Journal of Production Economics.
[9] Emre Cevikcan,et al. A Fuzzy Linear Programming Approach for Aggregate Production Planning , 2014, Supply Chain Management Under Fuzziness.
[10] Guohui Chen,et al. Modeling and Optimization for Short-term Scheduling of Multipurpose Batch Plants , 2014 .
[11] Andrew Y. C. Nee,et al. A Unified Model-based Integration of Process Planning and Scheduling , 2007 .
[12] C. Floudas,et al. Effective Continuous-Time Formulation for Short-Term Scheduling. 1. Multipurpose Batch Processes , 1998 .
[13] I. Karimi,et al. Scheduling Parallel Production Lines with Resource Constraints. 2. Decomposition Algorithm , 2002 .
[14] Iftekhar A. Karimi,et al. Scheduling Parallel Production Lines with Resource Constraints. 1. Model Formulation , 2002 .
[15] M. Wendt,et al. Optimal production planning under uncertain market conditions , 2003 .
[16] S. Ali Torabi,et al. Fuzzy hierarchical production planning (with a case study) , 2010, Fuzzy Sets Syst..
[17] C. Maravelias. Integration of Production Planning and Scheduling , 2009, Chemical Production Scheduling.
[18] Jasmine Siu Lee Lam,et al. Recoverable robustness in weekly berth and quay crane planning , 2019, Transportation Research Part B: Methodological.
[19] Josefa Mula,et al. Capacity and material requirement planning modelling by comparing deterministic and fuzzy models , 2008 .
[20] Luis Puigjaner,et al. Risk Management in the Scheduling of Batch Plants under Uncertain Market Demand , 2004 .
[21] Liang Gao,et al. Integration of process planning and scheduling - A modified genetic algorithm-based approach , 2009, Comput. Oper. Res..
[22] Bin Jiao,et al. Flow Shop Production Scheduling under Uncertainty within Infinite Intermediate Storage , 2011 .
[23] Adam Kasperski,et al. Minimizing maximum lateness in a single machine scheduling problem with fuzzy processing times and fuzzy due dates , 2001 .
[24] F. You,et al. A data-driven multistage adaptive robust optimization framework for planning and scheduling under uncertainty , 2017 .
[25] A. Barbosa‐Póvoa,et al. An Improved RTN Continuous-Time Formulation for the Short-term Scheduling of Multipurpose Batch Plants , 2001 .
[26] C. Hwang,et al. A new approach to some possibilistic linear programming problems , 1992 .
[27] J. Lasserre. An Integrated Model for Job-Shop Planning and Scheduling , 1992 .
[28] Yue Wu,et al. Production , Manufacturing and Logistics A robust optimization model for multi-site production planning problem in an uncertain environment , 2007 .
[29] Seyed Hessameddin Zegordi,et al. Production capacity planning and scheduling in a no-wait environment with controllable processing times: An integrated modeling approach , 2011, Expert Syst. Appl..
[30] Chao Shang,et al. Distributionally robust optimization for planning and scheduling under uncertainty , 2018, Comput. Chem. Eng..
[31] Hong-Sen Yan,et al. Solution Strategy of Integrated Optimization of Production Planning and Scheduling in a Flexible Job-shop: Solution Strategy of Integrated Optimization of Production Planning and Scheduling in a Flexible Job-shop , 2014 .
[32] Bernardo Almada-Lobo,et al. Integrated versus hierarchical approach to aggregate production planning and master production scheduling , 2017, OR Spectr..
[33] A. G. Lagodimos,et al. Hierarchical production planning for multi-product lines in the beverage industry , 2007 .
[34] Marianthi G. Ierapetritou,et al. Rolling horizon based planning and scheduling integration with production capacity consideration , 2010 .
[35] Mohammad Mahdi Paydar,et al. Emergency logistics planning under supply risk and demand uncertainty , 2020, Oper. Res..
[36] Nilay Shah,et al. RTN-based rolling horizon algorithms for medium term scheduling of multipur-pose plants , 1997 .
[37] Christodoulos A. Floudas,et al. Effective Continuous-Time Formulation for Short-Term Scheduling. 2. Continuous and Semicontinuous Processes , 1998 .
[38] Carlos A. Méndez,et al. An MILP framework for Short-Term Scheduling of Single-Stage Batch Plants with Limited Discrete Resources , 2002 .
[39] C. Pantelides,et al. A simple continuous-time process scheduling formulation and a novel solution algorithm , 1996 .
[40] Marianthi G. Ierapetritou,et al. Production planning and scheduling integration through augmented Lagrangian optimization , 2010, Comput. Chem. Eng..