Design and analysis of optimal material distribution policies in flexible manufacturing systems using a single AGV
暂无分享,去创建一个
[1] Subhash Wadhwa,et al. Impact of Routing Flexibility on the Performance of an FMS—A Simulation Study , 1997 .
[2] Kripa Shanker,et al. DETERMINATION OF OPTIMAL AGV FLEET SIZE FOR AN FMS , 1998 .
[3] C. Saygin,et al. Integrating Flexible Process Plans with Scheduling in Flexible Manufacturing Systems , 1999 .
[4] Bhaba R. Sarker,et al. An overview of path design and dispatching methods for automated guided vehicles , 1998 .
[5] Michael J. Shaw,et al. Information-Based Dynamic Manufacturing System Scheduling , 2001 .
[6] Rajan Batta,et al. Dynamic conflict-free routing of automated guided vehicles , 1999 .
[7] Eugene Levner,et al. Cyclic Scheduling of Operations for a Part Type in an FMS Handled by a Single Robot: A Parametric Critical-Path Approach , 1998 .
[8] Spyros A. Reveliotis. Conflict resolution in AGV systems , 2000 .
[9] Kurapati Venkatesh,et al. Flexible Manufacturing Systems: An Overview , 1994 .
[10] Ramakrishna Desiraju,et al. Performance Analysis of Flexible Manufacturing Systems with a Single Discrete Material-Handling Device , 1997 .
[11] Farzad Mahmoodi,et al. The Effects of Scheduling Rules and Routing Flexibility on the Performance of a Random Flexible Manufacturing System , 1999 .
[12] Yadati Narahari,et al. Performance modeling of automated manufacturing systems , 1992 .
[13] Michal Tzur,et al. Design of flexible assembly line to minimize equipment cost , 2000 .
[14] J. M. A. Tanchoco,et al. AGV dispatching based on workload balancing , 1999 .
[15] Felix T.S. Chan,et al. Evaluations of operational control rules in scheduling a flexible manufacturing system , 1999 .
[16] Nur Evin Özdemirel,et al. A self-organizing neural network approach for the single AGV routing problem , 2000, Eur. J. Oper. Res..
[17] F. Frank Chen,et al. Intelligent scheduling and control of rail-guided vehicles and load/unload operations in a flexible manufacturing system , 1999, J. Intell. Manuf..
[18] Pius J. Egbelu,et al. Integrated manufacturing planning for an AGV-based FMS , 1999 .
[19] M. Karwan,et al. Dynamic con ̄ ict-free routing of automated guided vehicles , 2002 .
[20] Hitoshi Tsubone,et al. A Comparison Between Machine Flexibility and Routing Flexibility , 1999 .
[21] Fariborz Y. Partovi,et al. Determining What to Benchmark: An Analytic Hierarchy Process Approach , 1994 .
[22] Bengt Lennartson,et al. Performance modeling of automated manufacturing systems , 1995, Autom..
[23] MICHAL TZUR,et al. Design of flexible assembly line to minimize equipment cost , 2000 .
[24] Hark Hwang,et al. Determination of unit load sizes of AGV in multi-product multi-line assembly production systems , 1999 .