Higher capability maturity dynamics of UK construction organisations

This paper attempts to identify the dynamics of the CMM (Capability Maturity Model) higher capability maturity level characteristics within the UK construction context from a theoretical perspective. Firstly, this paper follows a literature survey and a synthesis to identify the nature of CMM higher capability maturity level dynamics and its specific attachments to the software industry. Based on this synthesis, this paper presents a model to mimic the likely higher capability maturity dynamics of the UK construction industry.

[1]  C. Perry,et al.  Comprehensive criteria to judge validity and reliability of qualitative research within the realism paradigm , 2000 .

[2]  Carlos Torres Formoso,et al.  Setting stretch targets for driving continuous improvement in construction: analysis of Brazilian and UK practices , 2000 .

[3]  Peter E.D. Love,et al.  Concurrent Engineering in the Construction Industry , 1997 .

[4]  M. Hammer,et al.  REENGINEERING THE CORPORATION: A MANIFESTO FOR BUSINESS REVOLUTION , 1995 .

[5]  M. Finnemore,et al.  Standardised Process Improvement for Construction Enterprises ( SPICE ) , 1998 .

[6]  G. Clark,et al.  Reference , 2008 .

[7]  Peter E.D. Love,et al.  Employee empowerment in construction: an implementation model for process improvement , 2000 .

[8]  Douglas E. Lowe,et al.  Implementing the Capability Maturity Model for Software Development , 1996 .

[9]  Ghassan Aouad,et al.  The Process Protocol : Process and IT modelling for the UK Construction industry , 1998 .

[10]  J. Fairclough,et al.  RETHINKING CONSTRUCTION INNOVATION AND RESEARCH - A REVIEW OF THE GOVERNMENT'S R&D POLICIES AND PRACTICES , 2002 .

[11]  Watts S. Humphrey,et al.  A method for assessing the software engineering capability of contractors , 1987 .

[12]  Markku Tinnilä Strategic perspective to business process redesign , 1995 .

[13]  Mark C. Paulk,et al.  Key Practices of the Capability Maturity Model , 1991 .

[14]  James A. Powell,et al.  Assessing the level of teamwork in Brazilian and English construction sites , 2001 .

[15]  Marjan Sarshar,et al.  SPICE: a business process diagnostics tool for construction projects , 2000 .

[16]  Hamid Noori,et al.  The dynamics of continuous improvement , 1996 .

[17]  Mike Kagioglou Generic Design and Construction Process Protocol: Final Report , 1998 .

[18]  Low Sui Pheng,et al.  A framework for implementing TQM in construction , 1996 .

[19]  John Tookey,et al.  Expanding the meaning of standardisation within construction processes , 2002 .

[20]  P. Samuelsson Improvement Processes in Construction Companies , 2008 .

[21]  Mark C. Paulk,et al.  The Capability Maturity Model: Guidelines for Improving the Software Process , 1994 .

[22]  L. Koskela,et al.  Achieving Change in Construction , 2003 .

[23]  Watts S. Humphrey,et al.  Managing the software process , 1989, The SEI series in software engineering.

[24]  Peter E. D. Love,et al.  From BPR to CPR - conceptualising re-engineering in construction , 1998, Bus. Process. Manag. J..

[25]  Rob Pooley,et al.  The Capability Maturity Model for Software , 2004 .

[26]  R. Talwar Business re-engineering—a strategy-driven approach , 1993 .

[27]  M. Hammer,et al.  A manifesto for business revolution , 1993 .

[28]  Joseph Raynus Software Process Improvement With CMM , 1998 .

[29]  Suzanne Garcia,et al.  Key Practices of the Capability Maturity Model, Version 1.1 , 1993 .

[30]  J Bowe,et al.  Total quality management. , 1992, Contemporary longterm care.

[31]  Peter E.D. Love,et al.  Total quality management and the learning organization: a dialogue for change in construction , 2000 .

[32]  Michael Hammer,et al.  Reengineering Work: Don’t Automate, Obliterate , 1990 .

[33]  James T. O'Connor,et al.  Project Performance versus Use of Technologies at Project and Phase Levels , 2004 .

[34]  Paul Lillrank,et al.  The Transfer of Management Innovations from Japan , 1995 .

[35]  Guangleng Xiong,et al.  Concurrent engineering research and application , 1999 .

[36]  Mark C. Paulk,et al.  Capability Maturity Model for Software , 2001 .

[37]  R. Yin Case Study Research: Design and Methods , 1984 .

[38]  H. Harrington,et al.  Improving business processes , 1991 .