A bicriterion objective for levelling the schedule of a mixed-model, JIT assembly process
暂无分享,去创建一个
[1] J. Miltenberg,et al. Level schedules for mixed-model assembly lines in just-in-time production systems , 1989 .
[2] Jan Karel Lenstra,et al. Sequencing and scheduling : an annotated bibliography , 1997 .
[3] Uttarayan Bagchi,et al. Simultaneous Minimization of Mean and Variation of Flow Time and Waiting Time in Single Machine Systems , 1989, Oper. Res..
[4] W. Kubiak. Minimizing variation of production rates in just-in-time systems: A survey☆ , 1993 .
[5] Peter C Smith,et al. Measuring efficiency in the public sector , 1987 .
[6] John B. Kidd,et al. Toyota Production System , 1993 .
[7] T. Sen,et al. A branch-and-bound approach to the bicriterion scheduling problem invloving total flowtime and range of lateness , 1988 .
[8] David K. Smith,et al. Mathematical Programming: Theory and Algorithms , 1986 .
[9] Scott Julian Yeomans. Optimal level schedules for mixed-model, Just-in-Time assembly systems , 1992 .
[10] Ludo Gelders,et al. Solving a bicriterion scheduling problem , 1980 .
[11] Kenneth Steiglitz,et al. Combinatorial Optimization: Algorithms and Complexity , 1981 .
[12] Rakesh K. Sarin,et al. Scheduling with multiple performance measures: the one-machine case , 1986 .
[13] S. Sethi,et al. A Note on "Level Schedules for Mixed-Model Assembly Lines in Just-in-Time Production Systems" , 1991 .
[14] Richard L. Daniels,et al. A multi-objective approach to resource allocation in single machine scheduling , 1990 .
[15] Kenjiro Okamura,et al. A heuristic algorithm for the assembly line model-mix sequencing problem to minimize the risk of stopping the conveyor , 1979 .
[16] Rakesh K. Sarin,et al. Technical Note - Single Machine Scheduling with Controllable Processing Times and Number of Jobs Tardy , 1989, Oper. Res..
[17] Jan Karel Lenstra,et al. Perspectives on parallel computing , 1989 .
[18] R. R. Inman,et al. Sequencing JIT mixed-model assembly lines , 1991 .
[19] Jerzy Kyparisis,et al. Single machine scheduling research , 1987 .
[20] G. Steiner,et al. Level Schedules for Mixed-Model, Just-in-Time Processes , 1993 .