Purpose
There appears to be no empirical-based method in the literature for estimating if an engineering change proposal (ECP) will occur or the dollar amount incurred. This paper aims to present an empirically based approach to address this shortfall.
Design/methodology/approach
Using the cost assessment data enterprise database, 533 contracts were randomly selected via a stratified sampling plan to build two regression models: one to predict the likelihood of a contract experiencing an ECP and the other to determine the expected median per cent increase in baseline contract cost if an ECP was likely. Both models adopted a stepwise approach. A validation set was placed aside prior to any model building.
Findings
Not every contract incurs an ECP; approximately 80 per cent of the contracts in the database did not have an ECP. The likelihood of an ECP and the additional amount incurred appears to be statistically independent of acquisition phase, branch of service, commodity, contract type or any other factor except for the basic contract amount and the number of contract line item numbers; both of these later variables equally affected the contract percentage increase because of an ECP. The combined model overall bested current anecdotal approaches to ECP withhold.
Originality/value
This paper both serves as a published reference point for ECP withholds in the archival forum and presents an empirically based method for determining per cent ECP withhold to use.
[1]
Scot A Arnold,et al.
Choice of Contract Type and Other Policy Initiatives for Reducing Contract Prices
,
2013
.
[2]
Ian S. Cordell.
Engineering Change Orders and their Impact on DoD Acquisition Contracts
,
2017
.
[3]
C. Kopp.
Boeing GBU-39/B Small Diameter Bomb I / Raytheon GBU-53/B Small Diameter Bomb II
,
2007
.
[4]
Charlton E Freeman,et al.
Multivariate and Naive Bayes Text Classification Approach to Cost Growth Risk in Department of Defense Acquisition Programs
,
2013
.
[5]
Mark V. Arena,et al.
Historical Cost Growth of Completed Weapon System Programs
,
2006
.
[6]
Michael J Sullivan,et al.
Defense Acquisitions: Assessments of Selected Weapon Programs
,
2015
.
[7]
Harold F. Miller.
CH-47 Chinook
,
2008
.
[8]
Jonathan D. Ritschel,et al.
Estimating an acquisition program’s likelihood of staying within cost and schedule bounds
,
2017
.
[9]
Jerry M. Sollinger,et al.
Sources of Weapon System Cost Growth: Analysis of 35 Major Defense Acquisition Programs
,
2008
.