Cross-border effects of capacity mechanisms: Do uncoordinated market design changes contradict the goals of the European market integration?
暂无分享,去创建一个
Olga Gore | O. Gore | R. Meyer | Roland Meyer
[1] Paul L. Joskow,et al. Capacity payments in imperfect electricity markets: Need and design , 2008 .
[2] Elisabetta Pellini. Measuring the impact of market coupling on the Italian electricity market , 2011 .
[3] William W. Hogan,et al. ON AN "ENERGY ONLY" ELECTRICITY MARKET DESIGN FOR RESOURCE ADEQUACY , 2005 .
[4] Miles Bidwell,et al. Reliability Options: A Market-Oriented Approach to Long-Term Adequacy , 2005 .
[5] I. Pérez-Arriaga,et al. A Market Approach to Long-Term Security of Supply , 2002, IEEE Power Engineering Review.
[6] Necessity of Capacity Mechanisms , 2012 .
[7] R. Green,et al. Competition in the British Electricity Spot Market , 1992, Journal of Political Economy.
[8] L. D. Vries,et al. Generation adequacy: Helping the market do its job , 2007 .
[9] P. Joskow. Competitive Electricity Markets and Investment in New Generating Capacity , 2006 .
[10] Peter Cramton,et al. The Convergence of Market Designs for Adequate Generating Capacity , 2006 .
[11] Kathleen L. Spees,et al. A Comparison of PJM's RPM with Alternative Energy and Capacity Market Designs , 2009 .
[12] Axel Ockenfels,et al. Economics and Design of Capacity Markets for the Power Sector , 2012, Zeitschrift für Energiewirtschaft.
[13] Derek W. Bunn,et al. Valuation anomalies for interconnector transmission rights , 2013 .
[14] David M Newbery,et al. Competition, Contracts, and Entry in the Electricity Spot Market , 1998 .
[15] P. Cramton,et al. A capacity market that makes sense , 2005, IEEE Power Engineering Society General Meeting, 2005.
[16] Elena Fumagalli,et al. Integration of Electricity Markets in Europe: Relevant Issues for Italy , 2009 .
[17] M. Pollitt,et al. Electricity Market Reform in the European Union: Review of Progress toward Liberalization &Integration* , 2005 .
[18] M. D. Nooij,et al. The value of supply security The cost of power interruptions: Economic input for damage reduction and investment in networks , 2007 .
[19] Dominique Finon,et al. How to correct for long-term externalities of large-scale wind power development by a capacity mechanism? , 2013 .
[20] Peter Cramton,et al. Forward reliability markets: Less risk, less market power, more efficiency , 2008 .