Modelling of Robotic Disassembly Line Balancing
暂无分享,去创建一个
[1] Can Akkan,et al. Task-failure-driven rebalancing of disassembly lines , 2012 .
[2] Surendra M. Gupta,et al. Ant colony optimization for sequence‐dependent disassembly line balancing problem , 2013 .
[3] Eren Özceylan,et al. A solution approach based on beam search algorithm for disassembly line balancing problem , 2016 .
[4] Surendra M. Gupta,et al. Unified assembly- and disassembly-line model formulae , 2015 .
[5] Alexandre Dolgui,et al. A bibliographic review of production line design and balancing under uncertainty , 2015 .
[6] Ayyuce Aydemir-Karadag,et al. Multi-objective optimization of stochastic disassembly line balancing with station paralleling , 2013, Comput. Ind. Eng..
[7] Masoud Seidi,et al. The Balancing of Disassembly Line of Automobile Engine Using Genetic Algorithm (GA) in Fuzzy Environment , 2016 .
[8] Alexandre Dolgui,et al. Second order conic approximation for disassembly line design with joint probabilistic constraints , 2015, Eur. J. Oper. Res..
[9] Chaoyong Zhang,et al. An improved gravitational search algorithm for profit-oriented partial disassembly line balancing problem , 2017, Int. J. Prod. Res..
[10] Surendra M. Gupta,et al. 2-opt heuristic for the disassembly line balancing problem , 2004, SPIE Optics East.
[11] Surendra M. Gupta,et al. Multi-objective fuzzy disassembly line balancing using a hybrid discrete artificial bee colony algorithm , 2015 .
[12] Jia Liu,et al. Balancing Disassembly Line in Product Recovery to Promote the Coordinated Development of Economy and Environment , 2017 .
[13] Sagar V. Kamarthi,et al. Complications in disassembly line balancing , 2001, SPIE Optics East.
[14] Alexandre Dolgui,et al. A sample average approximation method for disassembly line balancing problem under uncertainty , 2014, Comput. Oper. Res..
[15] Surendra M. Gupta,et al. A balancing method and genetic algorithm for disassembly line balancing , 2007, Eur. J. Oper. Res..
[16] Surendra M. Gupta,et al. Disassembly line in product recovery , 2002 .
[17] Alexandre Dolgui,et al. A decomposition method for stochastic partial disassembly line balancing with profit maximization , 2013, 2013 IEEE International Conference on Automation Science and Engineering (CASE).
[18] Surendra M. Gupta,et al. Combinatorial optimization analysis of the unary NP-complete disassembly line balancing problem , 2007 .
[19] Levent Kandiller,et al. Profit-oriented disassembly-line balancing , 2008 .
[20] Wenjun Xu,et al. An improved multi-objective discrete bees algorithm for robotic disassembly line balancing problem in remanufacturing , 2018, The International Journal of Advanced Manufacturing Technology.
[21] Surendra M. Gupta,et al. Disassembly sequence plan generation using a branch-and-bound algorithm , 2001 .
[22] Eren Özceylan,et al. Resource Constrained Disassembly Line Balancing Problem , 2016 .
[23] Manoj Kumar Tiwari,et al. A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem , 2008 .
[24] Alexandre Dolgui,et al. Chance Constrained Programming Model for Stochastic Profit-Oriented Disassembly Line Balancing in the Presence of Hazardous Parts , 2013, APMS.
[25] S. Jack Hu,et al. Disassembly line balancing under high variety of end of life states using a joint precedence graph approach , 2015 .
[26] Alexandre Dolgui,et al. Lagrangian Relaxation for Stochastic Disassembly Line Balancing Problem , 2014 .
[27] Askiner Gungor,et al. A solution approach to the disassembly line balancing problem in the presence of task failures , 2001 .
[28] Surendra M. Gupta,et al. Ant colony optimization for disassembly sequencing with multiple objectives , 2006 .
[29] Masato Inoue,et al. Disassembly system modeling and design with parts selection for cost, recycling and CO2 saving rates using multi criteria optimization , 2016 .
[30] Alexandre Dolgui,et al. A Stochastic Formulation of the Disassembly Line Balancing Problem , 2012, APMS.
[31] Rajeev Jain,et al. A Fuzzy AHP and PROMETHEE method-based heuristic for disassembly line balancing problems , 2014 .
[32] Alfred J.D. Lambert,et al. Disassembly Modeling for Assembly, Maintenance, Reuse and Recycling , 2004 .
[33] Erkan Celik,et al. Supply-driven rebalancing of disassembly lines: A novel mathematical model approach , 2019, Journal of Cleaner Production.
[34] Xiaomin Zhu,et al. A multi-objective algorithm for task scheduling and resource allocation in cloud-based disassembly , 2016 .
[35] Surendra M. Gupta,et al. A tabu search algorithm for balancing a sequence-dependent disassembly line , 2014 .
[36] Yixiong Feng,et al. A new multi-objective ant colony algorithm for solving the disassembly line balancing problem , 2010 .
[37] Ihsan Sabuncuoglu,et al. Two exact formulations for disassembly line balancing problems with task precedence diagram construction using an AND/OR graph , 2009 .
[38] Alexandre Dolgui,et al. A taxonomy of line balancing problems and their solutionapproaches , 2013 .
[39] Mehmet Ali Ilgin. A DEMATEL-Based Disassembly Line Balancing Heuristic , 2019 .
[40] F. Tevhide Altekin,et al. A comparison of piecewise linear programming formulations for stochastic disassembly line balancing , 2017, Int. J. Prod. Res..
[41] Surendra M. Gupta,et al. Greedy algorithm for disassembly line scheduling , 2003, SMC'03 Conference Proceedings. 2003 IEEE International Conference on Systems, Man and Cybernetics. Conference Theme - System Security and Assurance (Cat. No.03CH37483).
[42] Alexandre Dolgui,et al. An exact solution approach for disassembly line balancing problem under uncertainty of the task processing times , 2015 .
[43] F. Tevhide Altekin,et al. Remedial actions for disassembly lines with stochastic task times , 2016, Comput. Ind. Eng..