Modelling of Robotic Disassembly Line Balancing

This chapter examines the balancing of robotic disassembly lines. It details the modelling of the line balancing problem and presents various models developed in recent years. The chapter also discusses the use of probability distributions and fuzzy numbers to account for uncertainties in task durations.

[1]  Can Akkan,et al.  Task-failure-driven rebalancing of disassembly lines , 2012 .

[2]  Surendra M. Gupta,et al.  Ant colony optimization for sequence‐dependent disassembly line balancing problem , 2013 .

[3]  Eren Özceylan,et al.  A solution approach based on beam search algorithm for disassembly line balancing problem , 2016 .

[4]  Surendra M. Gupta,et al.  Unified assembly- and disassembly-line model formulae , 2015 .

[5]  Alexandre Dolgui,et al.  A bibliographic review of production line design and balancing under uncertainty , 2015 .

[6]  Ayyuce Aydemir-Karadag,et al.  Multi-objective optimization of stochastic disassembly line balancing with station paralleling , 2013, Comput. Ind. Eng..

[7]  Masoud Seidi,et al.  The Balancing of Disassembly Line of Automobile Engine Using Genetic Algorithm (GA) in Fuzzy Environment , 2016 .

[8]  Alexandre Dolgui,et al.  Second order conic approximation for disassembly line design with joint probabilistic constraints , 2015, Eur. J. Oper. Res..

[9]  Chaoyong Zhang,et al.  An improved gravitational search algorithm for profit-oriented partial disassembly line balancing problem , 2017, Int. J. Prod. Res..

[10]  Surendra M. Gupta,et al.  2-opt heuristic for the disassembly line balancing problem , 2004, SPIE Optics East.

[11]  Surendra M. Gupta,et al.  Multi-objective fuzzy disassembly line balancing using a hybrid discrete artificial bee colony algorithm , 2015 .

[12]  Jia Liu,et al.  Balancing Disassembly Line in Product Recovery to Promote the Coordinated Development of Economy and Environment , 2017 .

[13]  Sagar V. Kamarthi,et al.  Complications in disassembly line balancing , 2001, SPIE Optics East.

[14]  Alexandre Dolgui,et al.  A sample average approximation method for disassembly line balancing problem under uncertainty , 2014, Comput. Oper. Res..

[15]  Surendra M. Gupta,et al.  A balancing method and genetic algorithm for disassembly line balancing , 2007, Eur. J. Oper. Res..

[16]  Surendra M. Gupta,et al.  Disassembly line in product recovery , 2002 .

[17]  Alexandre Dolgui,et al.  A decomposition method for stochastic partial disassembly line balancing with profit maximization , 2013, 2013 IEEE International Conference on Automation Science and Engineering (CASE).

[18]  Surendra M. Gupta,et al.  Combinatorial optimization analysis of the unary NP-complete disassembly line balancing problem , 2007 .

[19]  Levent Kandiller,et al.  Profit-oriented disassembly-line balancing , 2008 .

[20]  Wenjun Xu,et al.  An improved multi-objective discrete bees algorithm for robotic disassembly line balancing problem in remanufacturing , 2018, The International Journal of Advanced Manufacturing Technology.

[21]  Surendra M. Gupta,et al.  Disassembly sequence plan generation using a branch-and-bound algorithm , 2001 .

[22]  Eren Özceylan,et al.  Resource Constrained Disassembly Line Balancing Problem , 2016 .

[23]  Manoj Kumar Tiwari,et al.  A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem , 2008 .

[24]  Alexandre Dolgui,et al.  Chance Constrained Programming Model for Stochastic Profit-Oriented Disassembly Line Balancing in the Presence of Hazardous Parts , 2013, APMS.

[25]  S. Jack Hu,et al.  Disassembly line balancing under high variety of end of life states using a joint precedence graph approach , 2015 .

[26]  Alexandre Dolgui,et al.  Lagrangian Relaxation for Stochastic Disassembly Line Balancing Problem , 2014 .

[27]  Askiner Gungor,et al.  A solution approach to the disassembly line balancing problem in the presence of task failures , 2001 .

[28]  Surendra M. Gupta,et al.  Ant colony optimization for disassembly sequencing with multiple objectives , 2006 .

[29]  Masato Inoue,et al.  Disassembly system modeling and design with parts selection for cost, recycling and CO2 saving rates using multi criteria optimization , 2016 .

[30]  Alexandre Dolgui,et al.  A Stochastic Formulation of the Disassembly Line Balancing Problem , 2012, APMS.

[31]  Rajeev Jain,et al.  A Fuzzy AHP and PROMETHEE method-based heuristic for disassembly line balancing problems , 2014 .

[32]  Alfred J.D. Lambert,et al.  Disassembly Modeling for Assembly, Maintenance, Reuse and Recycling , 2004 .

[33]  Erkan Celik,et al.  Supply-driven rebalancing of disassembly lines: A novel mathematical model approach , 2019, Journal of Cleaner Production.

[34]  Xiaomin Zhu,et al.  A multi-objective algorithm for task scheduling and resource allocation in cloud-based disassembly , 2016 .

[35]  Surendra M. Gupta,et al.  A tabu search algorithm for balancing a sequence-dependent disassembly line , 2014 .

[36]  Yixiong Feng,et al.  A new multi-objective ant colony algorithm for solving the disassembly line balancing problem , 2010 .

[37]  Ihsan Sabuncuoglu,et al.  Two exact formulations for disassembly line balancing problems with task precedence diagram construction using an AND/OR graph , 2009 .

[38]  Alexandre Dolgui,et al.  A taxonomy of line balancing problems and their solutionapproaches , 2013 .

[39]  Mehmet Ali Ilgin A DEMATEL-Based Disassembly Line Balancing Heuristic , 2019 .

[40]  F. Tevhide Altekin,et al.  A comparison of piecewise linear programming formulations for stochastic disassembly line balancing , 2017, Int. J. Prod. Res..

[41]  Surendra M. Gupta,et al.  Greedy algorithm for disassembly line scheduling , 2003, SMC'03 Conference Proceedings. 2003 IEEE International Conference on Systems, Man and Cybernetics. Conference Theme - System Security and Assurance (Cat. No.03CH37483).

[42]  Alexandre Dolgui,et al.  An exact solution approach for disassembly line balancing problem under uncertainty of the task processing times , 2015 .

[43]  F. Tevhide Altekin,et al.  Remedial actions for disassembly lines with stochastic task times , 2016, Comput. Ind. Eng..