Multi-Objective Reentrant Hybrid Flowshop Scheduling with Machines Turning on and off Control Strategy Using Improved Multi-Verse Optimizer Algorithm
暂无分享,去创建一个
Lei Cao | Li Liu | Chunming Ye | Kaifeng Geng | C. Ye | Kaifeng Geng | Li Liu | Lei Cao
[1] Stephen C. Graves,et al. Scheduling of re-entrant flow shops , 1983 .
[2] Xiaolin Zhang,et al. Flame Image Segmentation Based on the Bee Colony Algorithm with Characteristics of Levy Flights , 2015 .
[3] Indrajit N. Trivedi,et al. Optimization of problems with multiple objectives using the multi-verse optimization algorithm , 2017, Knowl. Based Syst..
[4] Dong-Ho Lee,et al. Real-time scheduling for reentrant hybrid flow shops: A decision tree based mechanism and its application to a TFT-LCD line , 2011, Expert Syst. Appl..
[5] Jean-Charles Billaut,et al. Production , Manufacturing and Logistics A genetic algorithm for an industrial multiprocessor flow shop scheduling problem with recirculation , 2004 .
[6] Suk Joo Bae,et al. Bi-objective scheduling for reentrant hybrid flow shop using Pareto genetic algorithm , 2011, Comput. Ind. Eng..
[7] H-W Kim,et al. Heuristic algorithms for re-entrant hybrid flow shop scheduling with unrelated parallel machines , 2009 .
[8] Shih-Wei Lin,et al. Bi-objective reentrant hybrid flowshop scheduling: an iterated Pareto greedy algorithm , 2014 .
[9] Yeong-Dae Kim,et al. Minimizing makespan on an m-machine re-entrant flowshop , 2008, Comput. Oper. Res..
[10] George Q. Huang,et al. Hybrid flow shop scheduling considering machine electricity consumption cost , 2013 .
[11] Xiaodong Wang,et al. Bi-objective identical parallel machine scheduling to minimize total energy consumption and makespan , 2018, Journal of Cleaner Production.
[12] Michael Pinedo,et al. Scheduling: Theory, Algorithms and Systems Development , 1992 .
[13] Mehmet Bayram Yildirim,et al. A framework to minimise total energy consumption and total tardiness on a single machine , 2008 .
[14] Deming Lei,et al. A shuffled frog-leaping algorithm for flexible job shop scheduling with the consideration of energy consumption , 2017, Int. J. Prod. Res..
[15] Lei Wang,et al. Integrated green scheduling optimization of flexible job shop and crane transportation considering comprehensive energy consumption , 2019, Journal of Cleaner Production.
[16] Danping Lin,et al. Multi-level genetic algorithm for the resource-constrained re-entrant scheduling problem in the flow shop , 2013, Eng. Appl. Artif. Intell..
[17] David H. Wolpert,et al. No free lunch theorems for optimization , 1997, IEEE Trans. Evol. Comput..
[18] Seyyed M. T. Fatemi Ghomi,et al. Two stage reentrant hybrid flow shop with setup times and the criterion of minimizing makespan , 2011, Appl. Soft Comput..
[19] Dong-Ho Lee,et al. Scheduling algorithms for two-stage reentrant hybrid flow shops: minimizing makespan under the maximum allowable due dates , 2009 .
[20] S. Afshin Mansouri,et al. Green scheduling of a two-machine flowshop: Trade-off between makespan and energy consumption , 2016, Eur. J. Oper. Res..
[21] Ling Wang,et al. A Pareto-Based Discrete Harmony Search Algorithm for Bi-objective Reentrant Hybrid Flowshop Scheduling Problem , 2015, ICHSA.
[22] Huai Gao,et al. A modeling method of task-oriented energy consumption for machining manufacturing system , 2012 .
[23] David N. Kordonowy,et al. A power assessment of machining tools , 2002 .
[24] Yu Cheng,et al. Re-Entrant Flowshop Scheduling With Learning Considerations to Minimize The Makespan , 2018 .
[25] Joaquín B. Ordieres Meré,et al. Optimizing the production scheduling of a single machine to minimize total energy consumption costs , 2014 .
[26] M. Y. Wang,et al. Minimizing Makespan in a Class of Reentrant Shops , 1997, Oper. Res..
[27] Qi Wang,et al. An Efficient Multiobjective Backtracking Search Algorithm for Single Machine Scheduling with Controllable Processing Times , 2017 .
[28] Jen-Shiang Chen,et al. Mixed binary integer programming formulations for the reentrant job shop scheduling problem , 2005, Comput. Oper. Res..
[29] Danping Lin,et al. Integrating analytical hierarchy process to genetic algorithm for re-entrant flow shop scheduling problem , 2012 .
[30] Shu-Hsing Chung,et al. A case study on the multistage IC final testing scheduling problem with reentry , 2004 .
[31] Lin Danping,et al. A review of the research methodology for the re-entrant scheduling problem , 2011 .
[32] Mehmet Bayram Yildirim,et al. Single-Machine Sustainable Production Planning to Minimize Total Energy Consumption and Total Completion Time Using a Multiple Objective Genetic Algorithm , 2012, IEEE Transactions on Engineering Management.
[33] Ling Wang,et al. A modified teaching–learning-based optimisation algorithm for bi-objective re-entrant hybrid flowshop scheduling , 2016 .
[34] Seyed Mohammad Mirjalili,et al. Multi-Verse Optimizer: a nature-inspired algorithm for global optimization , 2015, Neural Computing and Applications.
[35] Ren Qing-dao-er-ji,et al. Inventory Based Bi-Objective Flow Shop Scheduling Model and Its Hybrid Genetic Algorithm , 2013 .
[36] Jen-Shiang Chen,et al. Minimizing makespan in reentrant flow-shops using hybrid tabu search , 2007 .
[37] Carlos A. Coello Coello,et al. Handling multiple objectives with particle swarm optimization , 2004, IEEE Transactions on Evolutionary Computation.
[38] T. Gutowski,et al. Environmentally benign manufacturing: Observations from Japan, Europe and the United States , 2005 .