A Method for Hydropower System Peak Operation Relying on the Load Demands of a Provincial Power Grid
暂无分享,去创建一个
[1] Boqiang Lin,et al. Electricity saving potential of the power generation industry in China , 2012 .
[2] Chuntian Cheng,et al. Optimization of peak loads among multiple provincial power grids under a central dispatching authority , 2014 .
[3] Yong-Gang Wu,et al. A diploid genetic approach to short-term scheduling of hydro-thermal system , 2000 .
[4] Jiankun He,et al. Economical assessment of large-scale photovoltaic power development in China , 2012 .
[5] Guo Qiang. Study on Scheme for Structure and Construction of Synchronous Power Grid in China from 2010 to 2020 , 2005 .
[6] Chuntian Cheng,et al. Short-Term Scheduling for Large-Scale Cascaded Hydropower Systems with Multivibration Zones of High Head , 2012 .
[7] Zuwei Yu,et al. A new long-term hydro production scheduling method for maximizing the profit of hydroelectric systems , 1998 .
[8] Chuntian Cheng,et al. Short-Term Hydroscheduling with Discrepant Objectives Using Multi-Step Progressive Optimality Algorithm1 , 2012 .
[9] William W.-G. Yeh,et al. Reservoir Management and Operations Models: A State‐of‐the‐Art Review , 1985 .
[10] Lei Zhang,et al. The temporal and spatial patterns and potential evaluation of China’s energy resources development , 2010 .