Analysis of Bridge Transition Zones in Railways Considering the Moisture Condition of the Ballast and Subballast
暂无分享,去创建一个
Valeri Markine | Haoyu Wang | Mika Silvast | Bruce Wiljanen | Haoyu Wang | V. Markine | M. Silvast | B. Wiljanen
[1] Antti Nurmikolu,et al. Identifying frost-susceptible areas on Finnish railways using the ground penetrating radar technique , 2013 .
[2] Manicka Dhanasekar,et al. State-of-the-art : track degradation at bridge transitions , 2013 .
[3] Valeri Markine,et al. Improvement of train-track interaction in transition zones via reduction of ballast damage , 2015 .
[4] Dingqing Li,et al. Transition of Railroad Bridge Approaches , 2005 .
[5] Andreas Lundqvist,et al. Railway track stiffness variation - consequences and countermeasures , 2010 .
[6] Andrew Chan,et al. Measurements and simulation of the dynamic responses of a bridge–embankment transition zone below a heavy haul railway line , 2013 .
[7] Tore Dahlberg,et al. Some railroad settlement models—A critical review , 2001 .
[8] T Saarenketo,et al. USING GPR ON RAILWAYS TO IDENTIFY FROST SUSCEPTIBLE AREAS , 2003 .
[9] Jean-Louis Briaud,et al. Preliminary Evaluation of the Bump at the End of the Railway Bridge , 2011 .
[10] Ernest T. Selig,et al. Track Geotechnology and Substructure Management , 1995 .
[11] H. Scheffel,et al. The Vertical Dynamic Response of a Rail Vehicle caused by Track Stiffness Variations along the Track , 1996 .
[12] P. J. Grabe,et al. The use of ground-penetrating radar to develop a track substructure characterisation model , 2013 .
[13] Antti Nurmikolu,et al. An Inspection of Railway Ballast Quality Using Ground Penetrating Radar in Finland , 2010 .
[14] Johannes Hugenschmidt,et al. Railway track inspection using GPR , 2000 .
[15] Simon Iwnicki,et al. The Manchester Benchmarks for Rail Vehicle Simulation , 1998 .
[16] William F. Anderson,et al. Model Testing of Two-Layer Railway Track Ballast , 2000 .
[17] P. Hölscher,et al. Settlement of ballasted track under traffic loading: Application to transition zones , 2014 .
[18] Paul Weston,et al. The behaviour of railway level crossings: Insights through field monitoring , 2014 .
[19] Rui Calçada,et al. Under sleeper pads in transition zones at railway underpasses: numerical modelling and experimental validation , 2015 .
[20] Sato Yoshihiko,et al. Japanese Studies on Deterioration of Ballasted Track , 1995 .
[21] Eldon J Yoder,et al. Effects of Repeated Loading on Gravel and Crushed Stone Base Course Materials Used in the AASHO Road Test , 1963 .
[22] William Powrie,et al. An Assessment of Transition Zone Performance , 2011 .
[23] B. Coelho. Dynamics of railway transition zones in soft soils , 2011 .
[24] Rui Calçada,et al. Design and construction of backfills for railway track transition zones , 2015 .
[25] X Lei,et al. Influence of Track Stiffness Distribution on Vehicle and Track Interactions in Track Transition , 2010 .
[26] Justin Kennedy,et al. Behaviour of train–track interaction in stiffness transitions , 2012 .
[27] P. Woodward,et al. Track Stiffness Management using the XiTRACK GeoComposite , 2004 .
[28] Michael Forde,et al. Electromagnetic properties of railway ballast , 2001 .
[29] Andreas Lundqvist,et al. Load impact on railway track due to unsupported sleepers , 2005 .
[30] B. Indraratna,et al. Field Assessment of the Performance of a Ballasted Rail Track with and without Geosynthetics , 2010 .
[31] Raimundo Delgado,et al. Calibration and experimental validation of a dynamic model of the train-track system at a culvert transition zone , 2018 .
[32] Rui Calçada,et al. A numerical study on the influence of backfill settlements in the train/track interaction at transition zones to railway bridges , 2016 .
[33] Luigi dell’Olio,et al. Track transitions in railways: A review , 2016 .
[34] Rolf Dollevoet,et al. Analysis of the Dynamic Behaviour of a Railway Track in Transition Zones With Differential Settlement , 2015 .
[35] Timo Saarenketo,et al. Electrical properties of water in clay and silty soils , 1998 .
[36] I. Y. Shevtsov,et al. Improvement of vehicle–turnout interaction by optimising the shape of crossing nose , 2014 .
[37] Ulf Isacsson,et al. State of the Art. I: Resilient Response of Unbound Aggregates , 2000 .
[38] Manicka Dhanasekar,et al. A nonlinear damage accumulation model for shakedown failure , 2007 .
[39] J. N. Varandas,et al. Dynamic behaviour of railway tracks on transitions zones , 2011 .
[40] Carlton L. Ho,et al. Evaluating Fouled Ballast Using Seismic Surface Waves , 2016 .
[41] Daniela Ionescu,et al. Compression and Degradation of Railway Ballast Under One-Dimensional Loading , 1997 .
[42] James P Hyslip,et al. Railway Bridge Transition Case Study , 2009 .
[43] Jianhui Lin,et al. Modelling and experiment of railway ballast vibrations , 2004 .
[44] Hem Hunt,et al. Settlement of railway track near bridge abutments , 1997 .
[45] Stephen T. Wilk,et al. Root cause of differential movement at bridge transition zones , 2016 .
[46] Dingqing Li,et al. Railway Bridge Approaches under Heavy Axle Load Traffic: Problems, Causes, and Remedies , 2010 .