Owner and Contractor Perceptions Toward Factors Causing Delays in Structural and Finishing Works
暂无分享,去创建一个
[1] Andi. The importance and allocation of risks in Indonesian construction projects , 2006 .
[2] James E. Diekmann,et al. Construction Claims: Frequency and Severity , 1985 .
[3] Sadi Assaf,et al. Causes of Delay in Large Building Construction Projects , 1995 .
[4] Tommy Y. Lo,et al. Construction Delays in Hong Kong Civil Engineering Projects , 2006 .
[5] Michael T. Callahan,et al. Construction Delay Claims , 1992 .
[6] Andi Andi,et al. FAKTOR-FAKTOR PENYEBAB REWORK PADA PEKERJAAN KONSTRUKSI , 2005 .
[7] C. William Ibbs. Quantitative Impacts of Project Change: Size Issues , 1997 .
[8] Andi,et al. Design documents quality in the Japanese construction industry: factors influencing and impacts on construction process , 2003 .
[9] David B. Ashley,et al. Data-Driven Analysis of “Corporate Risk” Using Historical Cost-Control Data , 1998 .
[10] Andi Andi,et al. Model Persamaan Struktural Pengaruh Budaya Keselamatan Kerja pada Perilaku Pekerja di Proyek Konstruksi , 2005 .
[11] Hendra Wijaya,et al. ON REPRESENTING FACTORS INFLUENCING TIME PERFORMANCE OF SHOP-HOUSE CONSTRUCTIONS IN SURABAYA , 2004 .
[12] Gary David Holt,et al. Factors influencing construction time and cost overruns on high-rise projects in Indonesia , 1997 .
[13] Michael T. Callahan,et al. Construction Project Scheduling , 1991 .
[14] Mohan M. Kumaraswamy,et al. A comparative study of causes of time overruns in Hong Kong construction projects , 1997 .