Integrated production scheduling in large-scale flexible electronic parts manufacturing
暂无分享,去创建一个
[1] Stanley Gershwin,et al. An algorithm for the computer control of production in a flexible manufacturing system , 1981, 1981 20th IEEE Conference on Decision and Control including the Symposium on Adaptive Processes.
[2] Robert J. Wittrock,et al. Scheduling Algorithms for Flexible Flow Lines , 1985, IBM J. Res. Dev..
[3] Willy Herroelen,et al. Proceedings of the 2nd ORSA TIMS conference on flexible manufacturing systems - Operations-research models and applications, University of Michigan, Ann-Arbor, MI, USA, August 12-15, 1986 (Stecke, K. - Suri, R.) , 1987 .
[4] Cynthia K. Whitney,et al. Decision support requirements in flexible manufacturing , 1984 .
[5] Willy Herroelen,et al. Management aspects of computerized manufacturing , 1983 .
[6] Andrew B. Whinston,et al. Control and Decision Support in Automatic Manufacturing Systems , 1980 .
[7] William L. Maxwell,et al. Establishing Consistent and Realistic Reorder Intervals in Production-Distribution Systems , 1985, Oper. Res..
[8] Dennis Johnson,et al. Component Allocation and Partitioning for a Dual Delivery Placement Machine , 1988, Oper. Res..
[9] Kathryn E. Stecke,et al. Formulation and Solution of Nonlinear Integer Production Planning Problems for Flexible Manufacturing Systems , 1983 .
[10] Thomas G. Gunn. The Mechanization of Design and Manufacturing. , 1982 .
[11] W. Maxwell,et al. Determining optimal reorder intervals in capacitated production-distribution systems , 1988 .
[12] Leon S. Lasdon,et al. An Efficient Algorithm for Multi-Item Scheduling , 1971, Oper. Res..
[13] S. Graves. Using Lagrangean Techniques to Solve Hierarchical Production Planning Problems , 1982 .