Integrated production scheduling in large-scale flexible electronic parts manufacturing

This study reports the development of a production scheduling system for the integrated management of production in large-scale, high-volume electronic assembly lines. The development of the system incorporates control and planning considerations by addressing the interaction of various subsystems. Stochastic and deterministic aspects of the problem environment are appropriately handled via relevant simulation and analytic models. By effecting a hierarchical breakdown of the problem environment, the system produces information used in practical decision making for production planning and scheduling. Procedures used encompass and address considerations for management of work-in-process, optimization of the various subsystems' performance, minimization of setup time effect, and inventory carrying costs.

[1]  Stanley Gershwin,et al.  An algorithm for the computer control of production in a flexible manufacturing system , 1981, 1981 20th IEEE Conference on Decision and Control including the Symposium on Adaptive Processes.

[2]  Robert J. Wittrock,et al.  Scheduling Algorithms for Flexible Flow Lines , 1985, IBM J. Res. Dev..

[3]  Willy Herroelen,et al.  Proceedings of the 2nd ORSA TIMS conference on flexible manufacturing systems - Operations-research models and applications, University of Michigan, Ann-Arbor, MI, USA, August 12-15, 1986 (Stecke, K. - Suri, R.) , 1987 .

[4]  Cynthia K. Whitney,et al.  Decision support requirements in flexible manufacturing , 1984 .

[5]  Willy Herroelen,et al.  Management aspects of computerized manufacturing , 1983 .

[6]  Andrew B. Whinston,et al.  Control and Decision Support in Automatic Manufacturing Systems , 1980 .

[7]  William L. Maxwell,et al.  Establishing Consistent and Realistic Reorder Intervals in Production-Distribution Systems , 1985, Oper. Res..

[8]  Dennis Johnson,et al.  Component Allocation and Partitioning for a Dual Delivery Placement Machine , 1988, Oper. Res..

[9]  Kathryn E. Stecke,et al.  Formulation and Solution of Nonlinear Integer Production Planning Problems for Flexible Manufacturing Systems , 1983 .

[10]  Thomas G. Gunn The Mechanization of Design and Manufacturing. , 1982 .

[11]  W. Maxwell,et al.  Determining optimal reorder intervals in capacitated production-distribution systems , 1988 .

[12]  Leon S. Lasdon,et al.  An Efficient Algorithm for Multi-Item Scheduling , 1971, Oper. Res..

[13]  S. Graves Using Lagrangean Techniques to Solve Hierarchical Production Planning Problems , 1982 .