First operation experiences with ITER-FEAT model pump

Design and manufacturing of the model cryopump for ITER-FEAT have been finished. After acceptance tests at the contractor's premises the pump was installed in the TIMO-facility which was prepared for testing the pump under ITER-FEAT relevant operating conditions. The procedures for the final acceptance tests are described. Travelling time, positioning accuracy and leak rate of the main valve are within the requirements. The heat loads to the 5 and 80 K circuits are a factor two better than the designed values. The maximum pumping speeds for H 2 , D 2 , He, Ne were measured. The value of 58 m 3 /s for D 2 is well above the contractual required value of 40 m 3 /s.