Single machine scheduling with job ready and delivery times subject to resource constraints
暂无分享,去创建一个
[1] A. Janiak. Some scheduling problems in job-shop type manufacturing processes with technological precedence constraints , 1995, Proceedings 1995 INRIA/IEEE Symposium on Emerging Technologies and Factory Automation. ETFA'95.
[2] C. Chu,et al. Some new efficient methods to solve the n/1/ri/ϵTi scheduling problem , 1992 .
[3] Adam Janiak. One-machine scheduling problems with resource constraints , 1986 .
[4] Adam Janiak,et al. One-machine scheduling with allocation of continuously-divisible resource and with no precedence constraints , 1987, Kybernetika.
[5] Lawrence. Davis,et al. Handbook Of Genetic Algorithms , 1990 .
[6] T.C.E. Cheng,et al. Resource optimal control in some single-machine scheduling problems , 1994, IEEE Trans. Autom. Control..
[7] L. Darrell Whitley,et al. GENITOR II: a distributed genetic algorithm , 1990, J. Exp. Theor. Artif. Intell..
[8] H. Hamacher,et al. Algebraic Flows and Time-Cost Tradeoff Problems , 1984 .
[9] Adam Janiak,et al. Time-optimal control in a single machine problem with resource constraints , 1986, Autom..
[10] A. Janiak,et al. Job-shop scheduling with convex models of operations , 1994 .