A Game Theoretic Approach to Decentralized Multi-Project Scheduling (Extended Abstract)
暂无分享,去创建一个
[1] M. Thathachar,et al. Networks of Learning Automata: Techniques for Online Stochastic Optimization , 2003 .
[2] Jörg Homberger,et al. A multi-agent system for the decentralized resource-constrained multi-project scheduling problem , 2007, Int. Trans. Oper. Res..
[3] R. Kolisch,et al. Heuristic algorithms for solving the resource-constrained project scheduling problem: Classification and computational analysis , 1998 .
[4] Patrick De Causmaecker,et al. A multi-agent learning approach for the multi-mode resource-constrained project scheduling problem , 2009, AAMAS 2009.
[5] Giuseppe Confessore,et al. A market-based multi-agent system model for decentralized multi-project scheduling , 2007, Ann. Oper. Res..
[6] Jörg Homberger,et al. A (μ, λ)-coordination mechanism for agent-based multi-project scheduling , 2009, OR Spectrum.
[7] R. Kolisch,et al. Heuristic algorithms for the resource-constrained project scheduling problem: classification and computational analysis , 1999 .