Methods for Improving the Tractability of the Block Sequencing Problem for Open Pit Mining
暂无分享,去创建一个
[1] Philip Wolfe,et al. Validation of subgradient optimization , 1974, Math. Program..
[2] Thys B Johnson,et al. OPTIMUM OPEN PIT MINE PRODUCTION SCHEDULING , 1968 .
[3] Salih Ramazan,et al. The new Fundamental Tree Algorithm for production scheduling of open pit mines , 2007, Eur. J. Oper. Res..
[4] E. Alaphia Wright. The use of dynamic programming for open pit mine design: Some practical implications , 1987 .
[5] B. Tolwinski. Scheduling production for open pit mines , 1998 .
[6] P Huttagosol,et al. A computer design of ultimate pit limit by using transportation algorithm. , 1992 .
[7] Salih Ramazan,et al. Traditional and New MIP Models for Production Scheduling With In-Situ Grade Variability , 2004 .
[8] J. Picard. Maximal Closure of a Graph and Applications to Combinatorial Problems , 1976 .
[9] Mark Gershon. Heuristic approaches for mine planning and production scheduling , 1987 .
[10] Wenlong. Cai. Application of network flow and zero-one programming to open pit mine design problems. , 1989 .
[11] Marshall L. Fisher,et al. An Applications Oriented Guide to Lagrangian Relaxation , 1985 .
[12] Ambros M. Gleixner,et al. LP-based disaggregation approaches to solving the open pit mining production scheduling problem with block processing selectivity , 2009, Comput. Oper. Res..
[13] K. Erarslan,et al. A simulative model for optimum open pit design , 2001 .
[14] Behrooz Karimi,et al. Long-term open pit mine production planning: a review of models and algorithms , 2008 .
[15] Peter A. Dowd. Short-term mine production scheduling for industrial minerals using multi-objective simulated annealing , 2002 .
[16] Hasan Sevim,et al. The Problem Of Production Planning In Open Pit Mines , 1998 .
[17] A. M. Starfield,et al. Dynamic programming with colour graphics smoothing for open-pit design on a personal computer , 1985 .
[18] LINEAR PROGRAMMING APPROACH TO MINE SCHEDULING OPTIMIZATION. , 1982 .
[19] Michael O. Ball,et al. A Comparison of Formulations for the Single-Airport Ground-Holding Problem with Banking Constraints , 2000, Oper. Res..
[20] Salih Ramazan. Open pit mine scheduling based on fundamental tree algorithm , 2007 .
[21] Birol Elevli,et al. Open pit mine design and extraction sequencing by use of OR and AI concepts , 1995 .
[22] Lou Caccetta,et al. An Application of Branch and Cut to Open Pit Mine Scheduling , 2003, J. Glob. Optim..
[23] Dorit S. Hochbaum. A new - old algorithm for minimum-cut and maximum-flow in closure graphs , 2001, Networks.
[24] Harvey J. Everett. Generalized Lagrange Multiplier Method for Solving Problems of Optimum Allocation of Resources , 1963 .
[25] R. Dimitrakopoulos,et al. Recent applications of operations research and efficient MIP formulations in open pit mining , 2004 .
[26] Dorit S. Hochbaum,et al. Performance Analysis and Best Implementations of Old and New Algorithms for the Open-Pit Mining Problem , 2000, Oper. Res..
[27] Roussos Dimitrakopoulos,et al. Conditional simulation algorithms for modelling orebody uncertainty in open pit optimisation , 1998 .
[28] Marshall L. Fisher,et al. The Lagrangian Relaxation Method for Solving Integer Programming Problems , 2004, Manag. Sci..
[29] Erkan Topal,et al. Production scheduling at LKAB's Kiruna Mine using mixed-integer programming , 2003 .
[30] L. M. Giannini. Optimum design of open pit mines , 1991, Bulletin of the Australian Mathematical Society.