Dispatching problems for parallel machines in the TFT-LCD assembly process

[1]  F. Pezzella,et al.  A genetic algorithm for the Flexible Job-shop Scheduling Problem , 2008, Comput. Oper. Res..

[2]  H. Neil Geismar,et al.  Integrated production and distribution scheduling with a perishable product , 2017, Eur. J. Oper. Res..

[3]  T.C.E. Cheng,et al.  Scheduling two job classes on parallel machines , 1995 .

[4]  Bharatendu Srivastava,et al.  An effective heuristic for minimising makespan on unrelated parallel machines , 1998, J. Oper. Res. Soc..

[5]  Xiaomin Zhu,et al.  A multi-objective algorithm for task scheduling and resource allocation in cloud-based disassembly , 2016 .

[6]  Nagraj Balakrishnan,et al.  Early/tardy scheduling with sequence dependent setups on uniform parallel machines , 1999, Comput. Oper. Res..

[7]  Chih-Cheng Chen,et al.  Automated Scheduling and Dispatching for TFT-LCD Color Filter Fabrication Plants , 2011 .

[8]  Lalit M. Patnaik,et al.  Genetic algorithms: a survey , 1994, Computer.

[9]  Geetha Srinivasan,et al.  A genetic algorithm for job shop scheduling—a case study , 1996 .

[10]  Erhan Kozan,et al.  Genetic algorithms to schedule container transfers at multimodal terminals , 1999 .

[11]  F. Frank Chen,et al.  Unrelated parallel machine scheduling with setup times using simulated annealing , 2002 .

[12]  Hong Zhou,et al.  Minimizing weighted tardiness of job-shop scheduling using a hybrid genetic algorithm , 2009, Eur. J. Oper. Res..

[13]  Funda Sivrikaya-Serifoglu,et al.  Parallel machine scheduling with earliness and tardiness penalties , 1999, Comput. Oper. Res..

[14]  Jatinder N. D. Gupta,et al.  Local search heuristics for two-stage flow shop problems with secondary criterion , 2002, Comput. Oper. Res..

[15]  Rubén Ruiz,et al.  TWO NEW ROBUST GENETIC ALGORITHMS FOR THE FLOWSHOP SCHEDULING PROBLEM , 2006 .

[16]  Alper Hamzadayi,et al.  Modeling and solving static m identical parallel machines scheduling problem with a common server and sequence dependent setup times , 2017, Comput. Ind. Eng..

[17]  V. J. Leon,et al.  Scheduling with product family set-up times: an application in TFT LCD manufacturing , 2004 .

[18]  Dipak Chaudhuri,et al.  Bicriteria scheduling problem for unrelated parallel machines , 1996 .

[19]  Paolo Serafini,et al.  Scheduling Jobs on Several Machines with the Job Splitting Property , 1996, Oper. Res..

[20]  Bongju Jeong,et al.  An assembly scheduler for TFT LCD manufacturing , 2001 .

[21]  Meral Azizoglu,et al.  Scheduling jobs on unrelated parallel machines to minimize regular total cost functions , 1999 .

[22]  A. H. I. Lee,et al.  Minimizing the Total Completion Time for the TFT-Array Factory Scheduling Problem (TAFSP) , 2007, ICCSA.

[23]  Ruhul A. Sarker,et al.  Production , Manufacturing and Logistics A real-time order acceptance and scheduling approach for permutation flow shop problems , 2015 .

[24]  Hamilton Emmons,et al.  Scheduling to a common due date on parallel uniform processors , 1987 .

[25]  Farouk Yalaoui,et al.  New method to minimize the preventive maintenance cost of series-parallel systems , 2003, Reliab. Eng. Syst. Saf..

[26]  Rubén Ruiz,et al.  A genetic algorithm for hybrid flowshops with sequence dependent setup times and machine eligibility , 2006, European Journal of Operational Research.