Systems approach to the multistage manufacturing connected-unit situation
暂无分享,去创建一个
This paper investigates the relationships among incoming quality limit (AIQL), manufacturing quality level in each stage of production, and outgoing quality limit (AOQL), for a multistage manufacturing connected‐unit situation from the systems cost‐effectiveness point of view. An objective function is developed and the formulated problem is solved using discrete optimization technique. The study is restricted to the development of single sampling plans where inspection is by attribute. Lot size and sample size are fixed for incoming and outgoing inspection for each stage of manufacturing.
[1] M. Johns,et al. Bayes Acceptance Sampling Procedures for Large Lots , 1959 .
[2] L. G. Mitten,et al. Design of an Optimal Sequence of Interrelated Sampling Plans , 1964 .
[3] A. Hald,et al. THE DETERMINATION OF SINGLE SAMPLING ATTRIBUTE PLANS WITH GIVEN PRODUCER'S AND CONSUMER'S RISK. A TABLE FOR SOLVING THE EQUATION B(C,N,P) = P FOR C = 0(1)100 AND 15 VALUES OF P , 1966 .