Development of a Sequential Restoration Strategy Based on the Enhanced Dijkstra Algorithm for Korean Power Systems

When a blackout occurs, it is important to reduce the time for power system restoration to minimize damage. For fast restoration, it is important to reduce taking time for the selection of generators, transmission lines and transformers. In addition, it is essential that a determination of a generator start-up sequence (GSS) be made to restore the power system. In this paper, we propose the optimal selection of black start units through the generator start-up sequence (GSS) to minimize the restoration time using generator characteristic data and the enhanced Dijkstra algorithm. For each restoration step, the sequence selected for the next start unit is recalculated to reflect the system conditions. The proposed method is verified by the empirical Korean power systems.

[1]  Wei Sun,et al.  Optimal Generator Start-Up Strategy for Power System Restoration , 2009, 2009 15th International Conference on Intelligent System Applications to Power Systems.

[2]  K. Shadan,et al.  Available online: , 2012 .

[3]  Pei Zhang,et al.  Computation of Milestones for Decision Support During System Restoration , 2011, IEEE Transactions on Power Systems.

[4]  J. J. Ancona A framework for power system restoration following a major power failure , 1995 .

[5]  Young-Moon Park,et al.  Application of expert system to power system restoration in sub-control center , 1997 .

[6]  R.J. Kafka Review of PJM restoration practices and NERC restoration standards , 2008, 2008 IEEE Power and Energy Society General Meeting - Conversion and Delivery of Electrical Energy in the 21st Century.

[7]  Chen-Ching Liu,et al.  From generic restoration actions to specific restoration strategies , 1995 .

[8]  M. Henderson,et al.  Addressing restoration issues for the ISO New England system , 2012, 2012 IEEE Power and Energy Society General Meeting.

[9]  S. Santoso,et al.  The Annual Black Start Service Selection Analysis of ERCOT Grid , 2009, IEEE Transactions on Power Systems.

[10]  R. Kafka,et al.  Power System Restoration - A Task Force Report , 1987, IEEE Transactions on Power Systems.

[11]  Sandeep Kumar,et al.  Appl. Sci , 2013 .

[12]  M. M. Adibi,et al.  Power System Restoration - The Second Task Force Report , 1987, IEEE Transactions on Power Systems.

[13]  J.M. Miller,et al.  Special Considerations in Power System Restoration , 1992, IEEE Power Engineering Review.

[14]  Pei Zhang,et al.  Constructing power system restoration strategies , 2009, 2009 International Conference on Electrical and Electronics Engineering - ELECO 2009.

[15]  Yi-Ting Chou,et al.  Development of a Black Start Decision Supporting System for Isolated Power Systems , 2013, IEEE Transactions on Power Systems.

[16]  Conversion and delivery of electrical energy in the 21st century , 2008, 2008 IEEE Power and Energy Society General Meeting - Conversion and Delivery of Electrical Energy in the 21st Century.

[17]  G. Heydt,et al.  Distribution System Restoration via Subgradient-Based Lagrangian Relaxation , 2008, IEEE Transactions on Power Systems.

[18]  M.M. Adibi,et al.  Power system restoration dynamics issues , 2008, 2008 IEEE Power and Energy Society General Meeting - Conversion and Delivery of Electrical Energy in the 21st Century.

[19]  M. M. Adibi,et al.  Power system restoration planning , 1994 .

[20]  Alan T. Crane,et al.  Physical vulnerability of electric systems to natural disaster and sabotage , 1990 .

[21]  G.T. Heydt,et al.  Viewing the Distribution Restoration Problem as the Dual of the Unit Commitment Problem , 2008, IEEE Transactions on Power Systems.

[22]  Wei Sun,et al.  Optimal Generator Start-Up Strategy for Bulk Power System Restoration , 2011, IEEE Transactions on Power Systems.

[23]  Hiroshi Sasaki,et al.  An efficient method for power distribution system restoration based on mathematical programming and operation strategy , 2000, PowerCon 2000. 2000 International Conference on Power System Technology. Proceedings (Cat. No.00EX409).