Islanded house operation using a micro CHP

The µCHP is expected as the successor of the conventional high-efficiency boiler producing next to heat also electricity with a comparable overall efficiency. A µCHP appliance saves money and reduces greenhouse gas emission. An additional functionality of the µCHP is using the appliance as a backupgenerator in case of a power outage. The µCHPcould supply the essential loads, the heating and reduce the discomfort up to a certain level. This requires modifications on the µCHP appliance itself as well as on the domestic electricity infrastructure. Furthermore some extra hardware and a control algorithm for load balancing are necessary. Our load balancing algorithm is supposed to start and stop the µCHP and switch off loads if necessary. The first simulation results show that most of the electricity usage is under the maximum generation line, but to reduce the discomfort an electricity buffer is required.

[1]  J. Stevens,et al.  A study of lead-acid battery efficiency near top-of-charge and the impact on PV system design , 1996, Conference Record of the Twenty Fifth IEEE Photovoltaic Specialists Conference - 1996.

[2]  Ali Feliachi,et al.  Residential load control through real-time pricing signals , 2003, Proceedings of the 35th Southeastern Symposium on System Theory, 2003..

[3]  M. Newborough,et al.  Controlling micro-CHP systems to modulate electrical load profiles , 2007 .

[4]  E. J. Bakker,et al.  Technisch energie- en CO2-besparingspotentieel van micro-wkk in Nederland (2010-2030). , 2006 .

[5]  K. Steemers,et al.  A method of formulating energy load profile for domestic buildings in the UK , 2005 .

[6]  M. Newborough,et al.  Demand-side management opportunities for the UK domestic sector , 1999 .

[7]  P. G. Cradinal Applicability of co-generation equipment as a source of standby or emergency power , 1998, 1998 IEEE Industrial and Commercial Power Systems Technical Conference. Conference Record. Papers Presented at the 1998 Annual Meeting (Cat. No.98CH36202).

[8]  Regina Lamedica,et al.  A bottom-up approach to residential load modeling , 1994 .

[9]  S. D. Probert,et al.  Rescheduling electricity demands in domestic buildings , 1993 .

[10]  Antonello Monti,et al.  A fuel cell based domestic uninterruptible power supply , 2002, APEC. Seventeenth Annual IEEE Applied Power Electronics Conference and Exposition (Cat. No.02CH37335).

[11]  A. Wright,et al.  The nature of domestic electricity-loads and effects of time averaging on statistics and on-site generation calculations , 2007 .