A Comparative Study of the Push and Pull Production Systems
暂无分享,去创建一个
[1] L. C. Lee,et al. A study of system characteristics in a manufacturing cell , 1985 .
[2] Mauro Caputo,et al. Production Management Techniques: Push‐Pull Classification and Application Conditions , 1988 .
[3] Bernard J. Schroer,et al. Just-In-Time (JIT), with Kanban, manufacturing system simulation on a microcomputer , 1985 .
[4] Loren Paul Rees,et al. A SIMULATION ANALYSIS OF THE JAPANESE JUST‐IN‐TIME TECHNIQUE (WITH KANBANS) FOR A MULTILINE, MULTISTAGE PRODUCTION SYSTEM , 1983 .
[5] L. C. LEEj. Parametric appraisal of the JIT system , 1987 .
[6] Maling Ebrahimpour,et al. Dynamic Simulation of a Kanban Production Inventory System , 1985 .
[7] Osamu Kimura,et al. Desiǵn and analysis of Pull System, a method of multi-staǵe production control , 1981 .
[8] Loren Paul Rees,et al. An investigation of the factors influencing the number of Kanbans required in the implementation of the JIT technique with Kanbans , 1987 .