Optimal due date quoting for a risk-averse decision-maker under CVaR
暂无分享,去创建一个
Desheng Dash Wu | Alexandre Dolgui | Sifeng Liu | Liangyan Tao | D. Wu | Sifeng Liu | A. Dolgui | Liangyan Tao
[1] D. R. Moodie. Due Date Demand Management : Negotiating the Trade-off Between Price and Delivery , 1999 .
[2] An Pan,et al. An agent-based negotiation model on price and delivery date in a fashion supply chain , 2016, Ann. Oper. Res..
[3] Meng Zhi-qing,et al. Optimal decisions for the loss-averse newsvendor problem under CVaR , 2015 .
[4] Dvir Shabtay,et al. Optimal due date assignment and resource allocation in a group technology scheduling environment , 2010, Comput. Oper. Res..
[5] Mike Wright,et al. Capacity and lead-time management when demand for service is seasonal and lead-time sensitive , 2015, Eur. J. Oper. Res..
[6] R. Rockafellar,et al. Optimization of conditional value-at risk , 2000 .
[7] Dvir Shabtay,et al. Optimal coordination of resource allocation, due date assignment and scheduling decisions , 2016 .
[8] Seyed Reza Hejazi,et al. Minimizing the weighted number of tardy jobs with due date assignment and capacity-constrained deliveries for multiple customers in supply chains , 2013, Eur. J. Oper. Res..
[9] M. Martinsuo. Project portfolio management in practice and in context , 2013 .
[10] Zhe George Zhang,et al. Technical Note - A Risk-Averse Newsvendor Model Under the CVaR Criterion , 2009, Oper. Res..
[11] Hanif D. Sherali,et al. Minimizing conditional-value-at-risk for stochastic scheduling problems , 2014, J. Sched..
[12] Gang Yu,et al. A two-stage stochastic programming approach for project planning with uncertain activity durations , 2007, J. Sched..
[13] Alexandre Dolgui,et al. Scheduling with due date assignment under special conditions on job processing , 2012, J. Sched..
[14] Ehsan Elahi,et al. An Integrated Outsourcing Framework: Analyzing Boeing’s Outsourcing Program for Dreamliner (B787) , 2014 .
[15] Jinting Wang,et al. A risk-averse newsvendor model with limited capacity and outsourcing under the CVaR criterion , 2015 .
[16] Frank Werner,et al. Scheduling with common due date, earliness and tardiness penalties for multimachine problems: A survey , 2004, Math. Comput. Model..
[17] Hsian Jong Hsiau,et al. A fuzzy pert approach to evaluate plant construction project scheduling risk under uncertain resources capacity , 2009 .
[18] Yao Zhao,et al. A Multiproduct Risk-Averse Newsvendor with Law-Invariant Coherent Measures of Risk , 2011, Oper. Res..
[19] David Gallear,et al. Decision support for build-to-order supply chain management through multiobjective optimization , 2012 .
[20] A. A. Elimam,et al. Project scheduling in optimizing integrated supply chain operations , 2013, Eur. J. Oper. Res..
[21] P. Griffin,et al. Coordination of marketing and production for price and leadtime decisions , 2006 .
[22] Kenneth R. Baker. Setting optimal due dates in a basic safe-scheduling model , 2014, Comput. Oper. Res..
[23] Vincent A. Mabert,et al. Evaluating project scheduling and due date assignment procedures: an experimental analysis , 1988 .
[24] Gang Li,et al. Optimal due-date assignment problem with learning effect and resource-dependent processing times , 2014, Optim. Lett..
[25] T.C.E. Cheng,et al. Due-date assignment and single-machine scheduling with generalised position-dependent deteriorating jobs and deteriorating multi-maintenance activities , 2014 .
[26] Vitaly A. Strusevich,et al. Single machine scheduling and due date assignment with positionally dependent processing times , 2009, Eur. J. Oper. Res..
[27] Dongmyung Lee,et al. Business integration model with due-date re-negotiations , 2010, Ind. Manag. Data Syst..
[28] Shokri Z. Selim,et al. Risk-averse multi-product selective newsvendor problem with different market entry scenarios under CVaR criterion , 2017, Comput. Ind. Eng..
[29] Houra Mahmoudzadeh,et al. A robust-CVaR optimization approach with application to breast cancer therapy , 2014, Eur. J. Oper. Res..
[30] H. M. Soroush,et al. Sequencing and due-date determination in the stochastic single machine problem with earliness and tardiness costs , 1999, Eur. J. Oper. Res..
[31] S. Tayur,et al. Due Date Management Policies , 2004 .
[32] S. S. Panwalkar,et al. Common Due Date Assignment to Minimize Total Penalty for the One Machine Scheduling Problem , 1982, Oper. Res..
[33] Dvir Shabtay,et al. Optimal restricted due date assignment in scheduling , 2016, Eur. J. Oper. Res..
[34] Raik Stolletz,et al. Revenue management approach to due date quoting and scheduling in an assemble-to-order production system , 2015, OR Spectr..
[35] Mats Engwall,et al. Project overload: An exploratory study of work and management in multi-project settings , 2006 .
[36] Dan Trietsch,et al. Setting due dates in a stochastic single machine environment , 2006, Comput. Oper. Res..
[37] S. A. Slotnick. Lead-time quotation when customers are sensitive to reputation , 2014 .