Assembly flow shop scheduling problem considering machine eligibility restrictions and auxiliary resource constraints

[1]  Rong Su,et al.  Decomposition methods for manufacturing system scheduling: a survey , 2018, IEEE/CAA Journal of Automatica Sinica.

[2]  Parviz Fattahi,et al.  Mathematical modeling and two efficient branch and bound algorithms for job shop scheduling problem followed by an assembly stage , 2021, Kybernetes.

[3]  Morteza Kiani,et al.  An efficient imperialist competitive algorithm for scheduling in the two-stage assembly flow shop problem , 2014 .

[4]  Chris N. Potts,et al.  The Two-Stage Assembly Scheduling Problem: Complexity and Approximation , 1995, Oper. Res..

[5]  Xiaoyue Zhang,et al.  Parallel dedicated machine scheduling problem with sequence-dependent setups and a single server , 2010, Comput. Ind. Eng..

[6]  Keyi Xing,et al.  Hybrid branch and bound algorithms for the two-stage assembly scheduling problem with separated setup times , 2019 .

[7]  Seyed Mohammad Hassan Hosseini Modelling and solving the job shop scheduling Problem followed by an assembly stage considering maintenance operations and access restrictions to machines , 2019 .

[8]  Xingsheng Gu,et al.  Distributed assembly permutation flow-shop scheduling problem with sequence-dependent set-up times using a novel biogeography-based optimization algorithm , 2021, Engineering Optimization.

[9]  Victor Fernandez-Viagas,et al.  Deterministic assembly scheduling problems: A review and classification of concurrent-type scheduling models and solution procedures , 2019, Eur. J. Oper. Res..

[10]  Fawaz S. Al-Anzi,et al.  The two-stage assembly flowshop scheduling problem with bicriteria of makespan and mean completion time , 2008 .

[11]  Shengyao Wang,et al.  A competitive memetic algorithm for the distributed two-stage assembly flow-shop scheduling problem , 2016 .

[12]  Chung-Yee Lee,et al.  Minimizing the makespan in the 3-machine assembly-type flowshop scheduling problem , 1993 .

[13]  Navid Sahebjamnia,et al.  A particle swarm optimization for a fuzzy multi-objective unrelated parallel machines scheduling problem , 2013, Appl. Soft Comput..

[14]  Jeng-Fung Chen,et al.  Unrelated parallel machine scheduling with secondary resource constraints , 2005 .

[15]  Jose M. Framiñan,et al.  The 2-stage assembly flowshop scheduling problem with total completion time: Efficient constructive heuristic and metaheuristic , 2017, Comput. Oper. Res..

[16]  Antonio Costa,et al.  A hybrid genetic algorithm for job sequencing and worker allocation in parallel unrelated machines with sequence-dependent setup times , 2013 .

[17]  Reza Tavakkoli-Moghaddam,et al.  A branch and bound algorithm for hybrid flow shop scheduling problem with setup time and assembly operations , 2014 .

[18]  Lamjed Ben Said,et al.  A branch-and-bound algorithm and four metaheuristics for minimizing total completion time for a two-stage assembly flow-shop scheduling problem with learning consideration , 2020, Engineering Optimization.

[19]  Javad Rezaeian,et al.  Resource-constrained unrelated parallel machine scheduling problem with sequence dependent setup times, precedence constraints and machine eligibility restrictions , 2016, Comput. Ind. Eng..

[20]  Jose A. Ventura,et al.  Parallel machine scheduling with earliness-tardiness penalties and additional resource constraints , 2003, Comput. Oper. Res..

[21]  Jose A. Ventura,et al.  Parallel machine scheduling about an unrestricted due date and additional resource constraints , 2000 .

[22]  Shaya Sheikh,et al.  Flow shop scheduling problems with assembly operations: a review and new trends , 2018, Int. J. Prod. Res..

[23]  Ceyda Oguz,et al.  Parallel machine scheduling with additional resources: Notation, classification, models and solution methods , 2013, Eur. J. Oper. Res..

[24]  Fariborz Jolai,et al.  A mathematical model and extension algorithm for assembly flexible flow shop scheduling problem , 2013 .