Plans for a new ECRH system at ASDEX upgrade
暂无分享,去创建一个
T. Franke | F. Leuterer | F. Monaco | M. Münich | H. Schütz | D. Wagner | H. Zohm | G. Gantenbein | R. Heidinger | M. Thumm | W. Kasparek | G. Denisov | A. Litvak | S. Malygin | E. Tai | F. Ryter | A. Bogdashov | V. Zapevalov | G. Dammertz | K. Koppenburg | G. Müller | A. Kuftin | V. Kurbatov | K. Kirov | R. Wilhelm | K. Voigt | H. Hailer
[1] R. W. Callis,et al. Design of a dual high-power, long pulse, steerable ECH launcher for DIII-D , 2002 .
[2] F. Leuterer,et al. ECRH experiments in ASDEX Upgrade , 2001 .
[3] F. Leuterer,et al. The ECRH system of ASDEX Upgrade , 2001 .
[4] G. Gantenbein,et al. Experience with the ECRH System of ASDEX Upgrade , 2001 .
[5] Manfred Thumm,et al. Frequency step-tunable (114–170 GHz) megawatt gyrotrons for plasma physics applications , 2001 .
[6] R. Heidinger,et al. Status report on CVD-diamond window development for high power ECRH , 2001 .