Green Procurement in Construction: Analysis of the Readiness Level and Key Catalyst among Construction Enablers

In the concern of sustainability and increasing awareness of environmental degradation, the Malaysian government has promoted numerous initiatives on green growth and green procurement (GP) to maintain and minimize the ecological effects in construction. However, this initiative is still in the infancy stage as to date, there is no specific guideline delineated to the construction industry, and it has yet to be enforced by the government to the construction practitioners. In construction, green procurement is a new area, and immediate actions are needed upon the principles, guidelines, and policy and implementation framework. Hence, this research aims to analyse the readiness level, barriers, and key catalysts among construction enablers towards adopting green procurement in the construction industry. Questionnaires were distributed to 102 construction enablers, focusing on quantity surveying firms in the Klang Valley area (Kuala Lumpur and Selangor), and 87 returned the responses. The analysis uses descriptive statistics via mean score, and the standard deviation was used to measure the variables and the mean's dispersion. It is revealed that the consultants are ready to adopt green procurement. However, GP's implementation's top challenges are lack of internal expertise, low awareness about green procurement, and lack of established best practices, standardized procedures and guidelines. It can be summarized that promoting GP and its implementation requires government support in policies, initiatives, and incentives. As the current practice is fragmented, ideally, GP's adoption in construction projects needs to conform to the acceptable standards that enable specific provisions to acquire eco-friendly sustainable construction.

[1]  Bo Xia,et al.  Green oriented procurement for building projects: Preliminary findings from Malaysia , 2017 .

[2]  J. Terman,et al.  Overcoming the barriers to green procurement in the county: Interest groups and administrative professionalism , 2016 .

[3]  F. Testa,et al.  Drawbacks and opportunities of green public procurement: an effective tool for sustainable production , 2016 .

[4]  Bo Xia,et al.  Developing green procurement framework for construction projects in Malaysia , 2015 .

[5]  Keith D. Hampson,et al.  Evaluation framework for green procurement in road construction , 2014 .

[6]  Norkhazimah Ahmad,et al.  Key Indicators towards the Implementation of Green Government Procurement in Malaysia , 2013 .

[7]  Qinghua Zhu,et al.  Motivating green public procurement in China: an individual level perspective. , 2013, Journal of environmental management.

[8]  Eric A. Fischer Green Procurement: Overview and Issues for Congress , 2013 .

[9]  N. Hashim,et al.  Readiness towards entrepreneurship education: Students and Malaysian universities , 2012 .

[10]  Yuhua Qiao,et al.  Issues and Challenges in Implementing China’sGreen Public Procurement Program , 2011 .

[11]  Ottar Michelsen,et al.  Green procurement in Norway; a survey of practices at the municipal and county level. , 2009, Journal of environmental management.

[12]  Yong Geng,et al.  Greening government procurement in developing countries: building capacity in China. , 2008, Journal of environmental management.

[13]  M. Hertzog Considerations in determining sample size for pilot studies. , 2008, Research in nursing & health.

[14]  Lin Li,et al.  Environmentally responsible public procurement (ERPP) and its implications for integrated product policy (IPP) , 2005 .

[15]  Sandra A. McIntire,et al.  A Factorial Analysis of Scales Measuring Competitiveness , 2002 .

[16]  Nils Larsson,et al.  Green Building Challenge: the development of an idea , 2001 .

[17]  Jurnal Pengurusan The Roles of Compliance with Government Procurement Policy : Moderating the Effects Between Explanatory Factors and Sustainable Public Procurement Practice , 2017 .

[18]  Norkhazimah Ahmad,et al.  Green Government Procurement Practices (GGP) in Malaysian Public Enterprises , 2016 .

[19]  Rebecca J. Yang,et al.  Modelling stakeholder-associated risk networks in green building projects , 2016 .

[20]  E. Akinlabi,et al.  Barriers in implementing green supply chain management in construction industry , 2014 .

[21]  Leidy E. Klotz,et al.  Social Sustainability Considerations during Planning and Design: Framework of Processes for Construction Projects , 2013 .